background image

1/17/03 

5

DIAGRAM  “4A” 

 

TRI-SENSOR CABLE / WIRING DIAGRAM 

 
 

 

 

 

 

 

 

 

RED 

 1 Flow   

 

 

         

FLOW 

 

 

WHITE 

 2 

 

 

 5 

 1 

 

 

 

  BROWN 

3 Salt 

 

 

 6 

SALT

 

 

 

 

 

  GREEN 

 

 

 4 

 2 

 

  

 

 

  BLACK 

5 Temp 

 
 

 

   3  

  BLUE 

 
 

 

TEMP. 

 
 

TRI-SENSOR CABLE PLUG 

 

 

(FEMALE CONNECTIONS) 

 
 

FLOW 

 

 DETECTOR 

 
 
 
 

 

 1 

 

 

 

 

 

TEMP 

 

 

 6 

 

SENSOR 

 
 

 

 2 

 4  

 

 

 

SALT  

 

 

  3 

 

SENSOR 

 
 
 
 

 

TRI-SENSOR ASSEMBLY HEAD PLUG 

 

 

(MALE CONNECTIONS) 

 
NOTE (Perform these tests on the Tri-Sensor Assembly):  
- Test for continuity of the FLOW pins by attaching a continuity meter test leads to pins #1 & #2 and 
manually activating the flow paddle to the center post. 
 
- Test for continuity of the SALT pins by attaching a continuity meter test leads to pin #3 and the 

INSIDE

 

of either of the two the salt blades.  Perform same test on pin #4 and the opposite blade. 
 

Отзывы: