4
Tech Support 770-844-4200
www.productivity2000.com
QR Code
Use any QR Code reader application to
display the module’s product insert.
Important Hot-Swap Information
The Productivity2000 System supports hot-swap!
Individual modules can be taken offline, removed, and
replaced while the rest of the system continues con-
trolling your process. Before attempting to use the hot-
swap feature, be sure to read the hot-swap topic in the
programming software’s help file or our online documen-
tation at AutomationDirect.com for details on how to plan
your installation for use of this powerful feature.
1
Align
with slot
2
rotate
to seated
position
Module Installation
WARNING:
Do not apply field power until
the following steps are completed. See
hot-swapping procedure for
exceptions.
WIRE STRIP
LENGTH
WIRE STRIP
LENGTH
Step One:
Align module
catch with base slot and
rotate module into
connector.
Locked
Unlocked
Step Two:
Pull top locking tab
toward module face. Click indi-
cates lock is
engaged.
Step Three:
Attach field wiring using the removable
terminal block or
ZIP
Link wiring
system.
Caution:
If possible, remove field power prior to
proceeding. If not, then
EXTREME
care
MUST
be taken
to prevent damage to the module, or even personal injury
due to a short circuit from the live terminal block.