www.productivity2000.com
Tech Support 770-844-4200
2
1
Align
with slot
2
rotate
to seated
position
Module Installation
WARNING:
Do not apply field power until
the following steps are completed. See
hot-swapping procedure for
exceptions.
WIRE STRIP
LENGTH
WIRE STRIP
LENGTH
Step One:
Align module
catch with base slot and
rotate module into
connector.
Locked
Unlocked
Step Two:
Pull top locking
tab toward module face. Click
indicates lock is
engaged.
Step Three:
Attach field wiring using the removable
terminal block or ZIPLink wiring
system.
Wiring Options
1
ZIPLink Feed Through Modules and Cables¹
0.5 m (1.6 ft) cable
1.0 m (3.3 ft) cable
2.0 m (6.6 ft) cable
ZL-RTB20
ZL-RTB20-1
ZL-P2-CBL18
ZL-P2-CBL18-1
ZL-P2-CBL18-2
Terminal Block with pigtail cable
1.0 m (3.3 ft) cable
2.0 m (6.6 ft) cable
ZL-P2-CBL18-1P
ZL-P2-CBL18-2P
3
Screw Terminal Block only
P2-RTB
(Quantity 1)
4
Spring Clamp Terminal Block only
P2-RTB-1
(Quantity 1)
5
Accessories²
ZL-RTB-COM
TW-SD-SL-1
TW-SD-MSL-1
ZL-RTB20
ZL-RTB20-1
2
1.Cable +
ZIP
Link Module = Complete System
2. ZL-RTB-COM provides a common connection point for power or ground