3.13 - FLUE OUTLET CONNECTION
The flue system must be installed in accordance with the local
regulation and national codes of practice.
The chimney is of fundamental importance for correct boiler
operation: it is therefore necessary that the chimney is
impermeable and properly insulated.
Old or new chimneys, built without respecting the specific
requirements can be recovered by “tubing” the chimney itself.
It will be necessary to introduce a metallic pipe inside the
existing chimney and insulate the space between the metallic
pipe and the chimney.
Chimneys made of prefabricated blocks must have perfectly
sealed joints to avoid that flue condensate leave the walls dirty
due to permeation.
The entrance to the chimney should be at an angle of 45°.
At the base of the chimney a flue inspection opening has to be
made.
It is advisable to insulate the boiler pipe connection to the
chimney in order to reduce the heat losses and noise.
1. Boiler
2. Flue outlet connection
3. Ashes collecting chamber
4. Chimney
5. External flue lining
6. Prefabricated blocks
7. Insulation
8. Flue outlet
We recommend using only flue outlets
suitable to the type of fuel used.
Damages caused by installation errors and for
non-observance of the instructions given by
the same manufacturer will invalidate all the
supplier’s contractual or extra contractual
responsibilities.
If the boiler has to be replaced ALWAYS replace the flue
outlet system
The flue outlet has to meet the latest regulations in force.