background image

Instruction guide 

T-SB

 – 1234150 

10 

Autochair Ltd 

Care and Maintenance 

For safe and trouble-free operation, a few routine procedures should be performed every day

 

the lift is used.

 

Visually inspect the lift and check for external damage or wear.

Check that the condition of the sling paying particular attention to the straps and connectors.

Check the hand control and the lift movements.

Check the emergency lowering function.

Charge the battery every day the lift is used, and check charger function.

Check the wheels and brakes.

When necessary, clean the lift with warm water using a damp cloth. 

NOTE!  

Do not use chemicals containing phenol or chlorine, since this may damage the coated finish. 

Do not immerse in water.

 

Storage

 

During transportation, or when the lift is not to be used for some time, the Power Pack should be switched 
off. Store the 

T-SB

 at a temperature exceeding freezing point and at normal relative humidity.

 

Inspection

 

The lift must be thoroughly inspected at least once per year. Pay particular attention to parts that show

 

wear, for example, joints, bolts, etc.

 

Service must be carried out according by Autochair authorised personnel.

 

IMPORTANT!

 

Repairs and maintenance may only be carried out by authorized Autochair service personnel using 

Autochair parts.

 

Содержание T-SB

Страница 1: ...Smart Transfer User Instructions T SB ...

Страница 2: ...the lift T SB is made of shaped steel sections and great care has been taken to eliminate excess weight Total weight with battery is 28 kg 62 lbs T SB can be disassembled in four pieces handle operating handle base unit and electrical unit No part weighs more than 18 kg 40 lbs This unit can be disassembled further only by an appropriately qualified and competent person removing the legs from the l...

Страница 3: ...cessories to safely meet the patient s need Before lifting always make certain that the lifting accessories are not damaged the lifting accessory is correctly and securely applied to the patient so that there is no risk of injury the lifting accessory is correctly applied to the lifting equipment the key hole plates are correctly attached to the spreader bar This should be checked when beginning t...

Страница 4: ... active operation 2min every 18min Motor T MPL 12V 15A max linear actuator push only with safety nut Degree of Protection IP42 Castors Front 75mm twin swivel Rear 75mm twin swivel with brake Built for indoor operation Weight Base 17 5kg 38 5lbs Lift Mast 7 5kg 16 5lbs Control Unit incl Power Pack and hand control 3kg 6 6lbs Type B according to the degree of protection against electrical shock Clas...

Страница 5: ...f the Handle from the cradle 3 Slide the Handle out from the legs and lift 4 Fit the handle into the Pivot Assembly as in the diagram above 5 Fit the leg operating handle into the Pivot Assembly as in the diagram above 6 Pull the handle toward you and move the legs to the centre position The handle will be in line with the post When the handle is released it will spring back into a locking hole Th...

Страница 6: ...ctrical the wheel brakes function correctly the LED lamp on the charger lights when on 7 Fit the Power Pack 8 Fit the T MPL Rest on lower pin first then align top pin and lower Ensure both pins are fully engaged 9 Fit the R Clip into the top pin 10 Fit the Spreader Bar Securely fitting the anti rotation plate into the T MPL Check the spreader bar then cannot rotate 11 Plug the T MPL into the Power...

Страница 7: ... can be lowered electrically by pressing the switch marked down on the emergency controls Refer to the T MPL instructions Emergency stop For emergency stop Switch the main switch off on the T MPL To release reset Change the switch back to the on position Locking the wheels To lock wheels step on the small pedal on the back of the wheel The wheel locks for lateral movement In most lifting situation...

Страница 8: ...ull charge will take 24 hours Never charge for more than 36 hours Always switch the unit off when not in use For maximum battery life batteries must be charged regularly We recommend charging every night after using the lift The battery charges fully in 24 hours but a top up charge overnight should be sufficient It is recommended to charge the unit in an upright position NOTE A red indicator lamp ...

Страница 9: ... R Clip and T MPL and pack using the bag provided Move the legs to the closed position by moving the Leg Operating Handle fully to the left Remove the Leg Operating Handle and stow on the main Handle using the clips provided Lift the Handle assembly from the Base and position the handle into the cut outs in the legs The mounting pins should be face down Slide the Handle forward then position the b...

Страница 10: ...oes not work satis factorily contact Autochair 7 Check the fuse in the side of the battery 1 Check that the charger is plugged into the wall socket and switched on 2 Check that the battery charger jack is correctly fitted in the Power Pack 3 If the charger still does not work satis factorily contact Autochair The lift stops in the elevated position 1 Check that the emergency switch is not in the o...

Страница 11: ...ecessary clean the lift with warm water using a damp cloth NOTE Do not use chemicals containing phenol or chlorine since this may damage the coated finish Do not immerse in water Storage During transportation or when the lift is not to be used for some time the Power Pack should be switched off Store the T SB at a temperature exceeding freezing point and at normal relative humidity Inspection The ...

Страница 12: ...0800 009 2326 service autochair co uk www autochair co uk Your Dealers Details ...

Отзывы: