4
INSTALLATION
LIFTING
The HIPAK Boxmaker will usually be delivered on a pallet. A forklift truck must be
used when lifting it. Great care must be taken, as the centre of gravity of the HIPAK is
high. Occasionally the HIPAK may be delivered un-palletised, when lifting must be
accomplished from the rear of the machine to prevent tipping.
If a machine is palletised, it will be secured to the pallet with brackets to aid stability.
ENVIRONMENT
Ensure that the machine is mounted on a level surface and bear in mind the weight when
selecting a site. Allow enough space around the HIPAK to handle materials. Extremes
of temperature should be avoided.
The HIPAK is supplied with a motorised conveyor table to ease handling of large
blanks. This is positioned behind the machine, and in front of the catcher table.
A competent, qualified engineer must make all connections to the machine.
Electrical connections to the conveyor from the Boxmaker are via plug and socket.
ELECTRICAL SUPPLY CONNECTIONS
The HIPAK requires a 415V 3 phase and neutral 50Hz supply, at 10A per phase.
Connections are made via the isolator on the left hand side of the machine. Entry is by
cable gland.
For electrical connections, consult the diagram provided at the back of this manual.
A PROTECTIVE EARTH MUST BE PROVIDED.
DISMANTLING
If for any reason, the machine has to be dismantled or removed, full details of the
correct procedure may be obtained by contacting The Technical Department at Autobox
Limited.
Under no circumstances must a person dismantle the machine without instructions being
given by the Autobox Technical Department.