34
|
Id.Nr.:243701-0
13. ELECTRICAL CONNECTION
13.1 GENERAL INSTRUCTIONS
a) The electrical connection must always be implemented in accordance with the circuit diagram
pasted in to the connection space of the storage tank!
b) Ensure the correct connection voltage!
c) An all-pole isolation switch with a contact opening width of 3 mm is to be provided in the
electrical supply line. Automatic circuit breakers are also permissible as isolators.
d) The connection cable must be inserted into the connection space of the storage tank and be
prevented from being pulled out and twisted by a strain relief mechanism. For register storage
heaters a second cable insert is provided for the charging pump control cable.
e) For installation and intrusive interventions into the device, the hot water storage tank must first
be isolated completely (all poles) and on every side from the power supply in compliance with EN
50110 (ÖVE, TAEV).
Before carrying out any further work, the system must be secured against the accidental
reconnection of the power supply (remove the fuses, trigger the mains circuit breaker).
13.2 RECONNECTION OPTIONS
In the case of storage tanks with optional heating times, reconnection of the
heating rods is to be carried out in accordance with the circuit diagram pasted
to the device. Switching installed at the factory is in line with the
6-hour heating time in ~ 230 V connection voltage. The polyphase circuits from 100 litres upwards, 3
~ 400 V and 3 N ~ 400 V, are also to be connected in accordance with the following table.
Reconnectable heating times and outputs at associated protection currents 16A.
Details in bold
indicate switching undertaken at the factory (6 hours
~
230 V)
*S = side heating element in the flange
M = middle heating element in the flange
M
16
S
8
S+M
6
S+S
4
S+M+S
3 1/3
4
3 1/3
3 1/3
Heating times with mains voltage
0,30
0,65
0,85
1,10
1,35
1,65
2,30
0,95
1,15
1,75
2,00
2,30
2,95
1,30
1,70
2,20
2,70
3,30
1,60
2,00
2,85
3,35
3,70
4,70
2,80
3,20
1,60
2,00
2,85
3,35
3,95
5,25
Radiator connection *
Heating up time H
50l
150l
80l
200l
100l
120l
kW
kW
kW
kW
kW
kW
~230V
3~400V
3N~400V
S+M+S in star