7.0 Information for the builder
Full co-operation and communication between the builder and you the under floor heating installer is
required to co-ordinate the installation of the heating system during the construction phase of the
building.
7.1 Site requirements
As the
Tiemme
under floor heating installer, it is in your interest to ensure that the main contractor (the
builder?) and other trades are made aware of the requirements for a clear working space. This is
essential to ensure the smooth running of the contract and if you make these requirements clear to the
main contractor, the installation will be quick and correct.
1.
The work site should be clear before commencement of work.
2.
Check who is responsible for the installation of the insulation, if specified.
3.
Mains water must be available for the flushing and pressure testing of the system.
4.
Any structural requirements are to be adhered to.
5.
No go zones for the piping are to be marked out with YELLOW
---
LINES on the prepared site.
7.2 Shopping list - parts required for the project
Item Description
Quantity
required
Make
Model /
size
Supplier
Boiler
1
Australian
Hydronic Supplies
Room thermostat -
Australian
Hydronic Supplies
Manifold kit –
Tiemme
CIRCUITS
Tiemme
Australian
Hydronic Supplies
Pipe coils 18 x 2.2 x 100 M
COILS
Tiemme
Australian
Hydronic Supplies
Pipe ties 2 per metre of pipe
Australian
Hydronic Supplies
Mesh
M
2
Builder
Insulation – under floor
M
2
Australian
Hydronic Supplies
Insulation – wall
M
Australian
Hydronic Supplies
Main feed pipe boiler to manifold
32 mm
Australian
Hydronic Supplies
Zone control Valves
CIRCUITS
Australian
Hydronic Supplies
Zone control thermostats
CIRCUITS
Australian
Hydronic Supplies