28 / 32
7.18
Accessories Installation
•
Install the front wheel stops.
•
Install the ramps on the lift.
•
Install the post cover onto the top of each column.
•
Install the power unit cover.
7.19
Check with load
Warning: please follow carefully the instructions in the coming paragraph
for avoiding damages on the lift.
Carried out two or three complete cycles of lowering with the vehicle loaded and lifting and:
•
Repeat the checks provided for by 7.15.
•
Check no strange noise during lifting and lowering.
•
If the runways weren’t leveled, readjust.
Содержание YL5000
Страница 1: ...1 32 jj YL5000 Wheel Alignment Four Post Lift Capacity 5000Kg USER S MANUAL ...
Страница 10: ...10 32 ...
Страница 12: ...12 32 5 4 Electrical Drawing 380V 400V 3Ph ...
Страница 13: ...13 32 5 5 Wiring Diagram ...
Страница 14: ...14 32 ...
Страница 20: ...20 32 ...