background image

 
 
 
6. 

 
Flat panel heavier than 85 Kg must use the VESA 400 of 600 mounting pattern of the 
system. When the screen is equipped with an equal mounting pattern on the back, please 
contact Audipack for a fitting interface bracket. 
 

 

 

VESA 400 

 

 

 

VESA 600 

 

L&S5 

 

Applicable loads: 
VESA 400 max. load 120 Kg 
VESA 600 max. load 120 Kg 
L&S5 max. load 85 Kg (with UFPRO) 
 

 

Flat panel installation with VESA interface and cams. 

When the flat panel is equipped with a VESA interface according the example, the screen 
can be installed with the cams inserted directly in the back. 
Choose one of the below (optional) cams to insert in the back. 
 

M6

 

part no. 392618 

 

M8

 

part no. 392318 

 

M10

  part no. 390618 

  

 
 
 
 
 

Содержание FS-QR120 E

Страница 1: ...Mounting and manual instruction FS QR120 E floor stand Copyright Audipack ...

Страница 2: ...his is importand because the cams on the back of the Audipack bracket on the back of the flat panel should corresond with the key holes of the llifitng head in lowest position Please read the manual in full before starting to assemble the floor stand 1 Take away both flightcase lids and assemble the floorstands floor plate on the desired position Make sure the floor plate is positioned on a level ...

Страница 3: ...the side of the colums Do not lift at the lifting head Do not lift the lifting head Grip handle Make sure both pins slide in equally At uncontrolled placing it might be more difficult to connect the coloumns Also lock this assembly with the locks tip lock afther full completion ...

Страница 4: ...The right heigth is the height where the cams of the bracket are equally high as the key holes in the lifting head 5 Take the flightcase and move the back side of the flat panel in front of the floor stand Hook in the cams and press the lifting button Stop the flat panel at any desired height by pressing the middle button See chapter 6 for using the right mounting patttern and applicable loads ...

Страница 5: ... VESA 600 L S5 Applicable loads VESA 400 max load 120 Kg VESA 600 max load 120 Kg L S5 max load 85 Kg with UFPRO Flat panel installation with VESA interface and cams When the flat panel is equipped with a VESA interface according the example the screen can be installed with the cams inserted directly in the back Choose one of the below optional cams to insert in the back M6 part no 392618 M8 part ...

Страница 6: ... standard L S5 interface a single padlock can be used to secure the set 8 Maintanance fine tuning It is possible to correct the horizontallevel of the floor stand It might be possible after a while it must be corrected Take away the C cover and udjust the M8 screw Hold down the cable do not let it rotate while adjusting the M8 bolt This might result in a twisted cable Use wrench 13 mm to adjust ...

Страница 7: ...lifting head coloured knobs are visible With an alan key the positions can be set by adjusting their position Adjusting the upper limit White knob While giving command up adjust the white knob with an alan key Check left and right turning for adjusting the right direction Adjusting lower position Yellow knob While giving command up adjust the yellow knob with an alan key Check left and right turni...

Страница 8: ...e of adjusting the bottom height for the DFS before installing the monitor Work along the below protocol to set the right height Adjusting new lower position only upwards Plug in power and lower the lifting head to its lower limit Use the rear mounted transmitter to control he system Press the buttons UP en DOWN at the same time until the mounting head moves up and down shortly program mode Press ...

Страница 9: ...h L S5 mounting interface 120 Kg with VESA 400 and 600 interface with cams Power supply 230 VAC 50 60 Hz Max Motor running time 4 minuten 9 minuten cool down period For questions or service please contact Audipack 079 5931671 Technical department Notes ...

Страница 10: ...to perform the pairing Take out the transmitter from the system Unplug the power for 20 seconds Plug in power for 10 seconds Unplug power for 2 seconds Plug back in the power the motor will rotate for a few seconds When the motor has stopped press the small prog button on the back of the PCB see picture The motor will rotate left and right shortly Programm button ...

Страница 11: ...em does not respond to the command a red light will blinck on the remote Check the battery and replace it Plug in main power of the system Audipack Industriestraat 2 2751 GT Moerkapelle 31 0 79 593 1671 Function LED ...

Отзывы: