Continuous sealer
D541
Maintenance
27
7.1 Maintenance schedule
7.1.1 Weekly
maintenance
Weekly maintenance should be carried out by the operating
personnel (see chapter 2 - ’Safety’).
7.1.2 Monthly
maintenance
Monthly maintenance should only be performed by authorised
maintenance personnel (see chapter 2 - ’Safety’).
7.1.3 Annual
maintenance
Annual maintenance should only be performed by authorised
maintenance personnel (see the preface).
Part
Work
Sealer
Clean the sealer with a damp cloth and mild soap (for
example, all-purpose cleaner).
Part
Work
PTFE fibreglass belts
Check the condition of the PTFE fibreglass belts.
Replace it if necessary.
(see section 7.2 - ’Replacing the PTFE fibreglass
Part
Work
Earth system
Check the earth according to NEN 3140 or
EN 50110-1.
Содержание D541
Страница 1: ...Continuous sealer D541 D541 ENG Rev 01 User manual www audion com...
Страница 36: ...Electrical Diagram 36 0 1 2 3 3 2 0 1 2 2 1 3 0 2 4 1 5 3 1 0 1 6 7 3 1 1 6 8 3 1 6 7 3 9 3...
Страница 39: ...Continuous sealer D541 Spare parts 39 A3 3 Exploded view A B B B B...
Страница 43: ......