background image

 
 
 
 
 
 
Bedding in

 

 

The new turntable and PSU require roughly 200 hours of initial 
use  (called  “bedding  in”)  before  the  circuitry  becomes  stable 
and optimum performance is realized. 

 

 

 

As  the  turntable  “beds  in”  the  sound  will  become  increasingly 
more smooth, detailed and open. 

 

 

 

Once  the  turntable  has  “bedded  in”  a  warm  up  time  of 
approximately 10 - 15 minutes is required each time the unit is 
switched on before optimum sonic performance is reached. 

 

Cleaning   

 

No  special  maintenance  is  required  for  the  turntable.  Use  a 
soft, clean lint free cloth to remove any surface marks from the 
casework / platter. For finger marks / grease, use a soft, clean 
lint  free  cloth,  lightly  moistened  with  a  solution  of  warm  water 
and  mild  detergent.  Do  not  use  any  alcohol  or  solvent  based 
cleaning products, as they may damage the finish. 

 

 

 

 

ENSURE  THAT  THE  TURNTABLE  IS  SWITCHED  OFF  AND 
DISCONNECTED 

FROM 

THE 

MAINS 

ELECTRICITY 

SUPPLY BEFORE UNDERTAKING ANY CLEANING. 

 

Bearing Oil

 

 

A  syringe  of  bearing  oil  is  supplied  with  the  TT-Three.  If  the 
bearing  requires  re-oiling,  place  2  –  3  drops  of  oil  directly  into 
the bearing well. The bearing oil only needs to be checked and 
renewed roughly every 2 years.  

 

Belt Life

   

 

The  belt  supplied  with  the  TT-Three  should  easily  provide 
many  years  of  excellent,  trouble-free  service.  It  should  not 
need  to  be  changed  for  at  least  5  years.  In  the  event  that  it 
requires  cleaning  (and  this  should  only  really  be  the  case  if 
grease, oil or some similar substance comes in contact with it), 
it  can  be  cleaned  with  a  very  mild  detergent  and  water.  Make 
sure it is thoroughly dry before it is re-installed on the turntable.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

OPERATION continued… 

Содержание TT-Three

Страница 1: ...TT Three TURNTABLE OWNER S INFORMATION...

Страница 2: ...FETY INFORMATION 2 CE DECLARATION OF CONFORMITY DISPOSAL POWER REQUIREMENTS 3 INTRODUCTION 4 OVERVIEW 5 UNPACKING AND INSTALLATION 23 CONNECTION 24 OPERATION 26 WARRANTY INFORMATION 27 CONTACT INFORMA...

Страница 3: ...P OUT OF THE REACH OF CHILDREN AND ANIMALS Do not store or operate this unit in areas of high humidity or in close proximity to water moisture Do not expose or immerse the unit in liquid of any kind T...

Страница 4: ...rdized documents BS EN 60065 in accordance with the regulations 73 23 EEC 89 336 EEC from 1 January 1997 CE 94 Peter Qvortrup Director Audio Note UK Limited Viscount House Star Road Star Trading Estat...

Страница 5: ...e subject to change without notice Therefore it is important to refer to the manual that is supplied with your product for the most accurate information manuals downloaded from our website or obtained...

Страница 6: ...and designed in house PSU 2 The power supply 2 features improved local power supply regulation for the signal generator improvements to the clock line and the output stage offering great improvements...

Страница 7: ...ying the weight of the units It would be preferably to position the power supply for the turntable either on a separate shelf or a suitable distance away from the turntable cartridge phonostage and an...

Страница 8: ...rranty will result We recommend that your dealer performs this procedure for you if you are in any way unsure Follow the unpacking and assembly instructions below The main components are shipped insid...

Страница 9: ...Remove the sub chassis from the box shown in RED UNPACKING AND INSTALLATION continued...

Страница 10: ...Locate and remove the sub platter bearing shown in RED UNPACKING AND INSTALLATION continued...

Страница 11: ...Locate and remove the motor protection foam rings shown in RED UNPACKING AND INSTALLATION continued...

Страница 12: ...Remove the foam slab covering the base motors shown in RED UNPACKING AND INSTALLATION continued...

Страница 13: ...Remove the two large side protection foam blocks shown in RED UNPACKING AND INSTALLATION continued...

Страница 14: ...Remove the main base motor unit shown in RED UNPACKING AND INSTALLATION continued...

Страница 15: ...Remove the base foam slab shown in RED UNPACKING AND INSTALLATION continued...

Страница 16: ...Remove the platter and its packing foam slab shown in RED UNPACKING AND INSTALLATION continued...

Страница 17: ...find the accessories belt bearing oil etc in a plastic bag at the side of the PSU box Once the turntable components have been fully unpacked place all of the packing materials back inside the main bo...

Страница 18: ...d level surface IT IS ESSENTAIL THAT THIS SURFACE IS LEVEL If it is not the suspension set up will be compromised and optimal performance will not be achievable Locate the three suspension towers show...

Страница 19: ...ce the sub chassis on the base motor unit IT IS ESSENTAIL THAT THE SUSPENSION TOWERS ARE CORRECTLY ALIGNED WITH THE PILLARS TUBES ON THE UNDERSIDE OF THE SUB CHASSIS UNPACKING AND INSTALLATION continu...

Страница 20: ...suspension tower pillars tubes which are on the underside of the sub chassis CHECK THAT THIS IS CORRECT FOR ALL THREE SUSPENSION TOWERS UNPACKING AND INSTALLATION continued SUSPENSION TOWER PLAN VIEW...

Страница 21: ...f the main bearing well No additional oil needs to be added to the bearing at this time the bearing has been fully charged with oil at the factory Once this has been done carefully insert the sub plat...

Страница 22: ...on can be adjusted the tonearm must be installed It is not necessary to install the cartridge at this time but the tonearm and its counter weight must be installed on the sub chassis UNPACKING AND INS...

Страница 23: ...l the way around the circumference of the platter If this is the case once the belt and platter have been installed then simply check that the platter is level with a spirit level both from front to b...

Страница 24: ...platter Looking at the top of each suspension tower you should see a small locking nut and the central adjustment screw Loosen the locking nut with an appropriately sized spanner and then adjust the h...

Страница 25: ...Three PSU is a four pin circular female socket connect the male end of the umbilical cable to this again it can only be inserted one way and tighten the locking ring PSU The TT Three PSU is equipped w...

Страница 26: ...e red front panel light should now be lit Speed Selector Turn the selector to the required playback speed move the switch clockwise to the right for 33 and counter clockwise to the left for 45 Start S...

Страница 27: ...o not use any alcohol or solvent based cleaning products as they may damage the finish ENSURE THAT THE TURNTABLE IS SWITCHED OFF AND DISCONNECTED FROM THE MAINS ELECTRICITY SUPPLY BEFORE UNDERTAKING A...

Страница 28: ...shipped please use the original packaging materials and include a copy of the original sales receipt along with a note explaining in as much detail as possible the problems you are experiencing with...

Страница 29: ...1 498 e mail info audionote co uk www audionote co uk Audio Note UK Ltd CONTACT INFORMATION If in the future your Audio Note UK product requires servicing or if you require technical support or have a...

Отзывы: