6
c) Connecting the controller output to the Bradley Smoker Tower with the power cord that
came with the Auber Controller
Auber
Controller
Smoke
Generator
Smoker Tower
Probe 1:
Cabinet Temp
Probe 2:
Internal Temp
Cable A
Cable B
To Power Outlet
Figure 5. Diagram
Figure 6. Back view