ATX Q-Series Power BAQ-UP Скачать руководство пользователя страница 7

           Q-Series

®

 Power – BAQ-UP™ (QRED) Redundancy Switch with Backup Amplifier – Installation & Operation Manual  

2-1

CHAPTER 2: DESCRIPTION OF OPERATION

DESCRIPTION OF OPERATION

2. 

Description of Operation

RF output levels of both the primary and the secondary amplifiers are sampled and this sample is converted to a voltage 

value. At initial power on, the system is switched to run on the primary amp. The yellow LED will flash slowly indicating the 

reference levels need to be set. By pressing the “Set Reference Levels” switch, the microcontroller samples the output values 

of both the primary amp and the secondary amp and stores the values as references. These values will be used to compare 

with the sampled output values of both amplifiers to confirm proper levels. At any time during the operation, one can always 

press the “Controller Reset” switch to reset the microcontroller program and store the new sampled values.
The remote control switch is activated by closing the remote control contacts. Activation (closing the contacts) effects a switch 

to the secondary amplifier. Removing the contact closure will cause a switch back to the primary amplifier. When the system 

is switched to the secondary amp, the yellow LED will flash quickly to warn the user. The remote control switch can change 

the system back and forth from the primary amp to the secondary amp by opening/closing the remote control contacts. The 

system detects the remote control switch periodically to check its state. If a change in status is detected on the remote control 

switch, the system will set to the primary or secondary amp according to the state of the contact closure. 
During normal operation, if both outputs are within 3 dB (factory programmable) of the reference values, no action will be 

taken. If the primary amp is down 3 dB or more and the secondary amp is not, the system considers the primary amp failed 

and will switch to the secondary amp, set Alarm 1, and set the red LED on. The system needs to be reset (by the controller 

reset push buttom on the front of the unit) at this point to get back to normal operation (after correcting the levels of the 

primary amplifier).
If both outputs are down 3 dB or more, the system considers the input is low and will set the red LED flashing quickly and set 

the alarms. The system needs to be reset at this point to get back to normal operation (after correcting the input levels).
If the system is running on the primary amp and the secondary amp level is down 3 dB or more, the  system considers the 

secondary amp failed and will set Alarm 2 and set the red LED flashing slowly. The system should be reset at this point to get 

back to normal operation (after making corrections to the secondary amp).
If the primary amp has failed and the microcontroller has switched to the secondary amp, the microcontroller can not perform 

any additional switches because the detectors are unable to sample any signal when the secondary amplifier is activated. 

The system needs to be reset at this point to get back to normal operation (after correcting the primary amplifier signal level). 

The remote control switch is non-functional in this situation since a switch can not be forced to a failed primary amplifier.
The total power within the bandwidth from the primary amplifier coming into the RF switch compartment should not exceed 50 

dBmV per channel. If only a portion of the TV channels is used, the maximum signal level per channel could be higher than 

50 dBmV and the minimum signal level should be higher than 20 dBmV. 

The recommended primary amplifier output level is between 20 dBmV and 50 dBmV with all the TV channels loaded within 

the passband. The secondary amplifier operates 20 dB lower than the primary amplifier during normal operation.

The system also stores the reference levels to the EEPROM on the microcontroller. When a power outage occurs, the system 

can retrieve the reference levels from the EEPROM after the power comes back on. After power on, the system waits for 

three minutes for the user to press the “Set Reference Levels” switch and will retrieve the levels from EEPROM if the switch is 

not pressed. The system will also warn the user with a steady yellow LED light when it’s using the retrieved reference levels. 

The user can press “Controller Reset” switch and then press the “Set Reference Levels” switch to overwrite the retrieved 

levels. Please notice that when the user first gets the system, there are reference levels stored into the EEPROM while the 

system was tested in the factory. 
During normal operation, Alarm 1 and Alarm 2 are energized (i.e. the Normally Open contact is connected to the Common 

contact). This configuration ensures that the user be alerted when power goes down.

Содержание Q-Series Power BAQ-UP

Страница 1: ...BAQ UP QRED Redundancy Switch with Backup Amplifier Q SERIES Power Installation Operation Manual ...

Страница 2: ... by one or more U S or foreign patents Other non ATX product and company names in this manual are the property of their respective companies Although every effort has been taken to ensure the accuracy of this document it may be necessary without notice to make amendments or correct omissions Specifications subject to change without notice ...

Страница 3: ...nstallation Operation Manual i TABLE OF CONTENTS Page 1 DESCRIPTION OF INTERFACES 1 1 2 DESCRIPTION OF OPERATION 2 1 2 1 Functional Schematic 2 2 3 SET UP PROCEDURE 3 1 4 SPECIFICATIONS 4 1 5 SERVICE SUPPORT 5 1 5 1 Contact ATX Networks 5 1 5 2 Warranty Information 5 1 ...

Страница 4: ...ii Q Series Power BAQ UP QRED Redundancy Switch with Backup Amplifier Installation Operation Manual This page left intentionally blank ...

Страница 5: ...over removed Input Test Point Output Test Point Gain Control Slope Control Input Pad used to optimize the input to the amplifier Description This is referred to as the secondary amplifier because your existing amplifier is referred to as the primary amplifier This internal amplifier has a low noise front end and is comparable in signal quality to any primary amplifier RF Switch Compartment Left si...

Страница 6: ...ED 5V power on Yellow LED warning On using reference levels stored in EEPROM Flashing 1 sec Needs to set reference levels Flashing 3 sec Switched to the secondary amplifier by the remote control switch Red LED alarm On Primary amp failure Flashing 1 sec Secondary amp failure Flashing 3 sec Input signal low primary amp and secondary amp failure RF Detectors Primary Amp RF Level Detector DC level pr...

Страница 7: ...ickly and set the alarms The system needs to be reset at this point to get back to normal operation after correcting the input levels If the system is running on the primary amp and the secondary amp level is down 3 dB or more the system considers the secondary amp failed and will set Alarm 2 and set the red LED flashing slowly The system should be reset at this point to get back to normal operati...

Страница 8: ...ed to switch to the secondary amplifier when the cumulative RF output of the primary amplifier falls below a programmed level usually a 3 dB drop This output is measured within a frequency range from 120 220 MHz The microprocessor controlled switch can be programmed to switch within the end users specifications for timing and RF levels Once a switch is made to the secondary amplifier the signal pa...

Страница 9: ...mpartment 10 Push the Set Ref Levels switch 11 Connect the and contact of the remote switch with a jumper to force the microcontroller switch to the secondary amplifier 12 Adjust the gain and slope control in the amplifier compartment to get desired signal level 13 Remove the jumper from the remote switch 14 Remove the signal strength meter from the Output of the RF switch compartment 15 Connect t...

Страница 10: ...3 2 Q Series Power BAQ UP QRED Redundancy Switch with Backup Amplifier Installation Operation Manual CHAPTER 3 SET UP PROCEDURE This page left intentionally blank ...

Страница 11: ...Q Series Power BAQ UP QRED Redundancy Switch with Backup Amplifier Installation Operation Manual 4 1 CHAPTER 4 SPECIFICATIONS SPECIFICATIONS 4 Specifications ...

Страница 12: ...4 2 Q Series Power BAQ UP QRED Redundancy Switch with Backup Amplifier Installation Operation Manual CHAPTER 4 SPECIFICATIONS This page left intentionally blank ...

Страница 13: ... Free 800 565 7488 USA Canada only Press 3 for Technical Support Then press 1 for Digital Video Products DVIS DigiVu UCrypt etc OR press 2 for All Other Products Email digitalvideosupport atxnetworks com for Digital Video Products Email jleskovar atxnetworks com for All Other Products CUSTOMER SERVICE ATX Networks 1 501 Clements Road West Ajax ON L1S 7H4 Canada Tel 905 428 6068 Toll Free 800 565 7...

Страница 14: ...nted in Canada Rev 07 15 ANW0849 1 501 Clements Road West Ajax ON L1S 7H4 Canada Tel 1 905 428 6068 Toll Free 1 800 565 7488 Fax 1 905 427 1964 Toll Free Fax 1 866 427 1964 www atxnetworks com support atxnetworks com ...

Отзывы: