ATT Zirocco-M100 Скачать руководство пользователя страница 3

3

Battery replacement................................................................................................................................................34
Wheels.....................................................................................................................................................................34
Replacement of wheels ...........................................................................................................................................34
Igniter Replacement Guide......................................................................................................................................35

Storage & Transportation .................................................................................................38
Wastedisposal................................................................................................................38

Содержание Zirocco-M100

Страница 1: ...Operating Manual Zirocco M100 Jet Dryer Cleaner...

Страница 2: ...ons 16 Before start up 17 Safety Stop 17 Power Up 18 Shut down and Cooling 20 Parking and storage 21 Display shut down 21 Re fuelling 21 Low Fuel Level 22 Change Filter Indication 22 Air filters Tradi...

Страница 3: ...3 Battery replacement 34 Wheels 34 Replacement of wheels 34 Igniter Replacement Guide 35 Storage Transportation 38 Wastedisposal 38...

Страница 4: ...DIRECTIVE 2006 42 EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 May 2006 on machinery The EMC Directive 2004 108 EC Person authorized to collect technical data and make them available to the...

Страница 5: ...04 2006 Safety of machinery Electrical equipment of machines General requirements DS EN ISO 13849 1 2006 Safety of machinery Safety related parts of control systems General principles for design ISO 1...

Страница 6: ...lated to an environmental noise level as weighted average of the different work steps during machine operation It is the maximum sound pressure which the operator will experience when using the machin...

Страница 7: ...is table the LWA value is used in the calculation of the TWA dose as a worst case although the operator normally would operate the machine at lower performance level because the marking equipment ofte...

Страница 8: ...ve or manufacturer Obligations of the Operator Before starting work all operators are obliged to as follows x To comply with the basic workplace safety instructions and accident prevention regulations...

Страница 9: ...work areas with limited air exchange respiratory protection or a limited use can be necessary to apply A backup operator needs to be present where oncoming traffic is not shielded from the working ar...

Страница 10: ...g removal Concrete drying Crack repair This Operating Manual utilise the following safety signs Follow these safety signs carefully since failure to comply may cause personnel injuries or irreparable...

Страница 11: ...and instructions in this document conform to the rules and provisions in the EU Machinery Directive 2006 42 EC and Directive 2004 104 EC INFORMATION This Operating Manual is subject to change without...

Страница 12: ...jects Independent and convenient machine operation as there is no need for a compressor or bottled gas supply The Zirocco M100 is equipped with a gas turbine which operates on standard diesel type EN5...

Страница 13: ...ay 2 Turbine module box 3 Fuel tank 4 Cyclone separator 5 Turbine cover 6 Gas Spring w adjusting lever 7 Battery 8 Battery cover 9 Nozzle available in various designs and widths 10 Nozzle Cover Shroud...

Страница 14: ...7 Safety stop Flashes red when the safety stop is enabled 8 Start up Wait Flashes when the turbine is heating up 9 Temperature indication 10 Operational hours Display page 2 Page 2 Display Page 2 1 A...

Страница 15: ...25 m2 5000 90 Battery 60 Ah 4000 10 Display DP 250 1000 10 Standard Nozzle 300 mm 2000 280 Labels ATT Logo 9000 30 Label Heat Warning sign 9000 20 Label Hearing protection Warning sign 9000 10 Turbine...

Страница 16: ...least 5 m from the machine during operation Hearing and eye protection The personnel in the immediate vicinity of the Zirocco M100 must use hearing protection and safety goggles when operating the Zi...

Страница 17: ...3 Release the lever Safety Stop Operating the machine Figure 2 1 The safety wire is connected to a stop switch The wire is attached to the operator during operation If the operator moves to a distance...

Страница 18: ...conds The key will automatically return to the middle position 1 when released See Figure 10 3 The pre heater symbol in the display will flash and the current temperature will be displayed when above...

Страница 19: ...indication flashes in order to avoid burn marks on the ground 8 The temperature can vary from app 400 460 C Figure 8 9 Press the button 2 to get on page 2 Figure 9 10 Press to increase the airflow bu...

Страница 20: ...nd then start a cooling program will cool down until below app 50 C The Zirocco M100 can be restarted once the display shows the text Ready to Start again Figure 11 2 When the key is turned to the lef...

Страница 21: ...ogram is completed and the operating symbol on the display has been off for 2 minutes The Zirocco M100 turns off automatically after 60 minutes factory setting The timer can be set from 20 to 60 minut...

Страница 22: ...tion or when worn out 2 Switch off the machine before replacing the filters Use only filter type ATT 5000 60 Then change the filters and turn the key to the left to reset the warning 3 This indication...

Страница 23: ...ter maximum 10 hours of operation 4 When prompted to change filter or if the filters are not serviceable then follow the step in Figure 19 Change filters Figure 19 1 Pull out and remove the filter hol...

Страница 24: ...the section Safety Instructions Fuel US specifications 1 D S15 ULSD Fuel capacity 31L 8 2 US Gallons Fuel consumption 25 35 L h 7 9 US Gallons h Battery 12V AGM 60 Ah Box size L02 min 100A Generator...

Страница 25: ...25 Dimensions...

Страница 26: ...26...

Страница 27: ...figure Each hazard zone requires its own protection measures x The NOISE zone requires protection to avoid loss of hearing ability x The EXHAUST zone where the use of safety glasses are required x Th...

Страница 28: ...otection Caution the nozzle cover can still be warm after the turbine has cooled down Order immediately new warning signs if the old ones get damaged Warning signs can be ordered via ATT or Distributo...

Страница 29: ...vel The fuel level symbol flashes red Fill up with fuel Wait 2 minutes to get CANBUS updated Safety switch activated Reset safety switch Turbine will not start after repeated attempts Contact ATT supp...

Страница 30: ...the cyclone separator 2 Loosen the quick releases on both sides of the heat shield 3 Lift and remove the heat shield 4 Loosen the quick releases on the turbine module box cover on both sides 5 Remove...

Страница 31: ...Remove the air filters 8 Check the air filter for dirt penetration or any damage 9 Replace if worn out and ensure that the edges of the air filters are aligned with the filter frame 8 Check for air b...

Страница 32: ...full functionality T Turbine e Module e Box x Replacement t 1 Remove the cyclone separator 2 Loosen the quick releases on both sides of the heat shield 3 Lift and remove the heat shield 4 Remove the...

Страница 33: ...move dust and dirt incl bitumen leftovers etc Check the Air Filters Replace if dirty or showing signs of tear Check fuel level in the display Refuel if necessary premix in a plastic cannister 1 12V V...

Страница 34: ...and wear It is recommended that they are replaced as soon as they show signs of damage New wheels and other spares and accessories can be ordered via our distributors see more on our website https zir...

Страница 35: ...bine generation is the ability for the operator to change the turbine igniter It was earlier required to stop the operation and send the turbine back to ATT for service The igniter is now placed acces...

Страница 36: ...s jet turbine Unclick the electrical wire by pressing on the sides of the connection Unscrew the igniter Be careful to keep the flat O ring sealing in place on the igniter Be careful not to forget abo...

Страница 37: ...ound cable from the turbine cover and tighten it by hand without using tools Reconnect the igniter wire After connecting the igniter the igniter and grounding wire are stripped together to keep them f...

Страница 38: ...ATT ATT recommends the use of our Nozzle Protection to avoid getting dust and dirt in the turbine when not in use both on the work site and in the storage facility Nozzle protection Item number 14000...

Страница 39: ...Applied Turbine Technologies Telephone 45 70236080 E Mail info zirocco dk or support zirocco dk Website www zirocco dk...

Отзывы: