background image

Purificare ©2015 

15

Parts Breakdown - PFC-20

8

6

2

1

3

5

7

9

4

14

10

13

11

12

ITEM 

NO.

PART NUMBER

DESCRIPTION

QTY.

1

ATS-832D

Domed Quartz

1

2

ATS4-810

UV Lamp

1

3

ATS-5172

Sightport Lens

1

4

ATS-5173

Orange .7" OD  Viewport O 

Ring

1

5

ATS-5171

Sightport Nut

1

6

ATS5-409

Brass End Nut

1

7

ATS8-544

Quartz Sleeve Black 1.2" OD 

ORing

1

8

ATS5-410 Lock 

Nut

Lock Nut

1

9

ATS8-546

Black 1.5" OD ORing

1

10

ATS-20GPM

Flow Control

1

11

ATS-271

Bottom Mounting Bracket

1

12

ATS-270

Top Mounting Bracket

1

13

STS-20GPM

20 Gallon Per Minute Bottom 

Feed Assembled Chamber

1

14

ATS-PFC

PFC Control Box

1

DO NOT SCALE DRAWING

SHEET 1 OF 1

SCALE: 

WEIGHT: 

REV

DWG.  NO.

SIZE

TITLE

NAME

DATE

MFG APPR.

ENG APPR.

CHECKED

FINISH

MATERIAL

5

4

3

2

1

TDB

DRAWN

A

PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF

AQUA TREATMENT SERVICES.  ANY 

REPRODUCTION IN PART OR AS A WHOLE

WITHOUT THE WRITTEN PERMISSION OF

AQUA TREATMENT SERVICES IS 

PROHIBITED.

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL .25"

TWO PLACE DECIMAL     .010"

THREE PLACE DECIMAL   .002"

UNLESS OTHERWISE SPECIFIED:

10/31/16

B

PFC-20 CUSTOMER BOM

8

6

2

1

3

5

7

9

4

14

10

13

11

12

ITEM 

NO.

PART NUMBER

DESCRIPTION

QTY.

1

ATS-832D

Domed Quartz

1

2

ATS4-810

UV Lamp

1

3

ATS-5172

Sightport Lens

1

4

ATS-5173

Orange .7" OD  Viewport O 

Ring

1

5

ATS-5171

Sightport Nut

1

6

ATS5-409

Brass End Nut

1

7

ATS8-544

Quartz Sleeve Black 1.2" OD 

ORing

1

8

ATS5-410 Lock 

Nut

Lock Nut

1

9

ATS8-546

Black 1.5" OD ORing

1

10

ATS-20GPM

Flow Control

1

11

ATS-271

Bottom Mounting Bracket

1

12

ATS-270

Top Mounting Bracket

1

13

STS-20GPM

20 Gallon Per Minute Bottom 

Feed Assembled Chamber

1

14

ATS-PFC

PFC Control Box

1

DO NOT SCALE DRAWING

SHEET 1 OF 1

SCALE: 

WEIGHT: 

REV

DWG.  NO.

SIZE

TITLE

NAME

DATE

MFG APPR.

ENG APPR.

CHECKED

FINISH

MATERIAL

5

4

3

2

1

TDB

DRAWN

A

PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF

AQUA TREATMENT SERVICES.  ANY 

REPRODUCTION IN PART OR AS A WHOLE

WITHOUT THE WRITTEN PERMISSION OF

AQUA TREATMENT SERVICES IS 

PROHIBITED.

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL .25"

TWO PLACE DECIMAL     .010"

THREE PLACE DECIMAL   .002"

UNLESS OTHERWISE SPECIFIED:

10/31/16

B

PFC-20 CUSTOMER BOM

PFC © 2019 • www.aquat.com        

Содержание Purificare PFC-12

Страница 1: ... Info Installation Operation and Maintenance Manual CAUTION Read and Follow all safety rules and operating instructions before first use of product Ultraviolet Disinfection Systems MODELS PFC 8 PFC 12 PFC 20 ...

Страница 2: ...Purificare 2015 2 ...

Страница 3: ...on 6 Installation Diagram 7 Electronic Controls Startup Procedures 8 Sanitation Procedures 10 Maintenance 12 Unit Parts Breakdown 13 Circuit Board Layout 16 Wiring Diagram 17 Troubleshooting 18 Sterile Water Sample Precedures 19 Specifications 20 Notes 21 Warranty 23 Table of Contents PFC 2019 www aquat com ...

Страница 4: ...ay cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this disinfection system where it will be exposed to temperatures below freezing unless all the water has been drained from it and the water supply has been disconnected 8 Read and observe all the important notices and warnings on the water disinfectio...

Страница 5: ...equipment may be required if these parameters cannot be maintained Flow rate must not exceed The PFC series has an unique design with an ultraviolet germicidal lamp housed within a single quartz sleeve surrounded by a stainless steel pressure chamber The chamber is fabricated out of 304 Stainless Steel These units come with an ultraviolet lamp designed with four pins at one end The quartz sleeve i...

Страница 6: ...for proper wall support Use anchors with screws for sufficient support not included A lock nut secures the mounting bracket to the U V chamber If your piping system is subject to impulse pressure resulting in a water hammer condition a surge tank or other means must be provided to remove this condition otherwise this extreme shock pressure condition may rupture or fracture the quartz sleeve Make a...

Страница 7: ...Purificare 2015 7 Installation Diagram PFC 2019 www aquat com ...

Страница 8: ...to the lamp connector 2 Plug the electrical control box into a 120V wall plug outlet 3 Upon start up the U V lamp Detector and Timer circuit board will perform a self diagnostic test When power is applied the circuit board will perform an output check to see if lamp or probe is connected Once detected the lamp will light and go into an approximate 2 minute lamp optimization period as shown in Fig ...

Страница 9: ...Purificare 2015 9 Sample Screen Shots PFC 2019 www aquat com ...

Страница 10: ... Water in the well and storage tank should be treated with a strong chlorine solution to destroy disease organisms All pipelines and fixtures in the distribution system should be rinsed and flushed with chlorinated water Upon installation of a U V disinfection unit or yearly bulb replacement service disinfection with chlorine to initially flush the system is recommended to assure line sanitation p...

Страница 11: ... and disinfect the water if necessary Plumbing Line Sanitation Only When installing an ultraviolet disinfection system a prefilter with sump may serve as a source to sanitize the water lines only For whole system disinfection follow procedure as outlined above Source The Pennsylvania State University College of Agriculture Cooperative Extension How to Sanitize a Water System Using Well Sanitizer P...

Страница 12: ...trical connection Then remove brass end nut Install the quartz sleeve through the stainless steel threaded nipple until it is centered in the Quartz spring Use a small amount of plumber s grease and install the O ring around the quartz sleeve Avoid riding the O Ring on any threaded part of the nipple Hand tighten the brass end nut to form a compression seal around the quartz sleeve Avoid overtight...

Страница 13: ...6 2 1 1 10 3 5 4 8 4 3 2 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 476D Domed Quartz 1 2 ATS4 450 UV Lamp 1 3 ATS 268 Top Mounting Bracket 1 4 ATS 5172 Sightport Lens 1 5 ATS 5173 Orange 7 OD Viewport O Ring 1 6 ATS 5171 Sightport Nut 1 7 ATS5 409 Brass End Nut 1 8 ATS8 544 Quartz Sleeve Black 1 2 OD ORing 1 9 ATS5 410 Lock Nut 1 10 ATS8 546 Black 1 5 OD ORing 1 11 ATS 8GPM Flow Control 1 12 STS 8...

Страница 14: ...NAL 25 TWO PLACE DECIMAL 010 THREE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 10 31 16 B PFC 12 CUSTOMER BOM 6 8 1 3 5 2 10 7 9 4 11 14 12 13 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS1 759D Domed Quartz 1 2 ATS4 739 UV Lamp 1 3 ATS 5172 Sightport Lens 1 4 ATS 5173 Orange 7 OD Viewport O Ring 1 5 ATS 5171 Sightport Nut 1 6 ATS5 409 Brass End Nut 1 7 ATS8 544 Quartz Sleeve Black 1 2 OD ORing 1 8 A...

Страница 15: ...ER 8 6 2 1 3 5 7 9 4 4 0 3 1 12 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 832D Domed Quartz 1 2 ATS4 810 UV Lamp 1 3 ATS 5172 Sightport Lens 1 4 ATS 5173 Orange 7 OD Viewport O Ring 1 5 ATS 5171 Sightport Nut 1 6 ATS5 409 Brass End Nut 1 7 ATS8 544 Quartz Sleeve Black 1 2 OD ORing 1 8 ATS5 410 Lock Nut Lock Nut 1 9 ATS8 546 Black 1 5 OD ORing 1 10 ATS 20GPM Flow Control 1 11 ATS 271 Bottom Mountin...

Страница 16: ...Purificare 2015 16 Circuit Board Layout PFC 2019 www aquat com ...

Страница 17: ...st Power Display Backlight Touch Black White Green Red White Green White Blue Blue Yellow Yellow Red Red 2 1 2 1 J8 Ballast Status 2 1 Ballast Red Yellow 1 2 1 2 3 Blue Brown J6 Green Wire Crimp Green AC Power Cord UV Bulb Cable Panel Mounted Fuse Holder Wiring Diagram PFC 2019 www aquat com ...

Страница 18: ...0V Electrical cord disconnected Check replace or outlet defective Defective U V lamp Replace Lamp Defective lamp ballast Check output voltage Replace ballast Loose open circuit wire Trace out and repair Leak at quartz nipple Defective or cracked O Ring Replace O Ring O Ring not seated properly Replace O Ring Cracked Quartz Sleeve Replace Quartz Sleeve PFC 2019 www aquat com ...

Страница 19: ...n the sterile bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the sample The operator must not allow his finger to touch the inside of the cap or the neck of the bottle 4 After the sample has been taken the cap should immediately be tightly placed on the sample container ...

Страница 20: ...oid acts as a fail safe shut off valve Providing extra protection for the system UV Probe UV dosage metering device This UV Probe reads only the 254 nm intensity output of the Ultraviolet Light within the UV treatment chamber Optional on PFC units only PFC 2019 www aquat com ...

Страница 21: ...Purificare 2015 21 Notes PFC 2019 www aquat com ...

Страница 22: ...Purificare 2015 22 Notes PFC 2019 www aquat com ...

Страница 23: ...Purificare 2015 23 Notes PFC 2019 www aquat com ...

Страница 24: ...Purificare 2015 24 Warranty PFC 2019 www aquat com ...

Отзывы: