background image

GDS ©2016

4

WARNING - to guard against injury, basic safety  
precautions should be observed, including the 
following:

1. READ AND FOLLOW ALL SAFETY 
INSTRUCTIONS.

2. DANGER - To avoid possible electric shock, special 
care should be taken since water is present near electrical 
equipment.  Unless a situation is encountered that is 
explicitly addressed by the provided maintenance and 
troubleshooting sections, do not attempt repairs yourself, 
refer to an authorized service facility.
3. Carefully examine the disinfection system after 
installation.  It should not be plugged in if there is water on 
parts not intended to be wet.
4. Do not operate the disinfection system if it has a 
damaged power cord or plug, if it is malfunctioning or if it 
is dropped or damaged in any manner.
5. Always shut off water flow and unplug the disinfection 
system before performing cleaning or maintenance 
activities. Never pull on the power cord to remove it from 
an outlet. Grab the plug and pull to disconnect.
6. Do not use this disinfection system for anything other 
than the intended use (potable water applications.)  The 
use of attachments not approved, recommended or sold 
by the manufacturer / distributor may cause an unsafe 
condition.
7. Intended for indoor use.  Do not install this disinfection 
system where it will be exposed to the weather.  Do not 
store this disinfection system where it will be exposed 
to temperatures below freezing unless all the water has 
been drained from it and the water supply has been 
disconnected.
8. Read and observe all the important notices and warnings 
on the water disinfection system.
9. If an extension cord is necessary, a cord with a proper 
rating should be used.  A cord rated for less Amperes or 
Watts than the disinfection system is rated for may cause 
over heating.  Care should be taken to arrange the cord so 
that it will not be tripped over or accidentally pulled from 
the outlet.

1. SAVE THESE INSTRUCTIONS.

2. WARNING:  The ultraviolet light given off by this 
unit can cause serious burns to unprotected eyes and skin.  
Never look directly at a lit U.V. lamp.  When performing 
any work on the U.V. Disinfection System, always unplug 
the unit first.  Never operate the U.V. system while the 
lamp is outside of the U.V. chamber.
3. WARNING:  The U.V. lamp inside of the disinfection 
system is rated at an effective life of approximately 9,000 
hours.  To ensure continuous water treatment, replace the 
U.V. lamp annually with the appropriate Aqua Treatment 
Services U.V. lamp.  Failure to comply may present a fire 
hazard. 

General Safety Instructions

GDS ©2019 • www.aquat.com

Содержание GDS-12

Страница 1: ... Info Installation Operation and Maintenance Manual CAUTION Read and Follow all safety rules and operating instructions before first use of product Ultraviolet Disinfection Systems Models GDS 8 GDS 12 GDS 20 ...

Страница 2: ...GDS 2016 2 ...

Страница 3: ...6 Installation Diagram 7 Electronic Controls Startup Procedures 8 Sanitation Procedures 10 Maintenance 12 Unit Parts Breakdown 13 Circuit Board Layout 16 Wiring Diagram 17 Troubleshooting 18 Sterile Water Sample Precedures 19 Specifications 20 Notes 21 Warranty 23 Table of Contents GDS 2019 www aquat com ...

Страница 4: ...ause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this disinfection system where it will be exposed to temperatures below freezing unless all the water has been drained from it and the water supply has been disconnected 8 Read and observe all the important notices and warnings on the water disinfection sy...

Страница 5: ...tion equipment may be required if these parameters cannot be maintained Flow rate must not The GDS series has an unique design with an ultraviolet germicidal lamp housed within a single quartz sleeve surrounded by a stainless steel pressure chamber The chamber is fabricated out of 304 Stainless Steel These units come with an ultraviolet lamp designed with four pins at one end The quartz sleeve is ...

Страница 6: ...proper wall support Use anchores with screws for sufficient support not included A lock nut secures the mounting bracket to the U V chamber If your piping system is subject to impulse pressure resulting in a water hammer condition a surge tank or other means must be provided to remove this condition otherwise this extreme shock pressure condition may rupture or fracture the quartz sleeve Make all ...

Страница 7: ...GDS 2016 7 Installation Diagram GDS 2019 www aquat com ...

Страница 8: ... This is also equipped with an internal and external fused surge protection system This solid state electronic circuit board provides the latest in U V lamp monitoring technology U V LAMP CONTROL START UP PROCEDURE 1 Make sure the U V lamp is inserted per instructions into the quartz sleeve and U V chamber Then plug the U V lamp into the end lamp connectors 2 Plug the unit into a 120V wall plug ou...

Страница 9: ...GDS 2016 9 Sample Screen Shots GDS 2019 www aquat com MONTH DAY ALARM Fig 1 MONTH DAY ALARM Fig 2 MONTH DAY ALARM Fig 3 MONTH DAY ALARM Fig 4 ...

Страница 10: ...er in the well and storage tank should be treated with a strong chlorine solution to destroy disease organisms All pipelines and fixtures in the distribution system should be rinsed and flushed with chlorinated water Upon installation of a U V disinfection unit or yearly bulb replacement service disinfection with chlorine to initially flush the system is recommended to assure line sanitation prior...

Страница 11: ... disinfect the water if necessary Plumbing Line Sanitation Only When installing an ultraviolet disinfection system a pre filter with sump may serve as a source to sanitize the water lines only For whole system disinfection follow procedure as outlined above Source The Pennsylvania State University College of Agriculture Cooperative Extension How to Sanitize a Water System Using Well Sanitizer Pell...

Страница 12: ...trical connection Then remove brass end nut Install the quartz sleeve through the stainless steel threaded nipple until it is centered in the quartz spring Use a small amount of plumber s grease and install the O ring around the quartz sleeve Avoid riding the O Ring on any threaded part of the nipple Hand tighten the brass end nut to form a compression seal around the quartz sleeve Avoid over tigh...

Страница 13: ...LACE DECIMAL 010 THREE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 3 29 2017 ATS GDS CUSTOMER 3 5 2 6 7 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS GDSF GDS Control Box Front Cover 1 2 ATS 281P ATS 281P Circuit Board 1 3 ATS PBBP Plastic Control Box Back Plate 1 4 ATS 4003 Power Cord 1 5 03 SA 015 Molded Lamp Cord 1 6 07 00017 Fuse 1 7 ATS1 421P GDS Ballast 1 DO NOT SCALE DRAWING SHEET 1 OF 1 SCALE...

Страница 14: ...H CHECKED ENG APPR MFG APPR DATE NAME TITLE SIZE DWG NO REV WEIGHT SCALE SHEET 1 OF 1 DO NOT SCALE DRAWING 12 6 3 5 2 1 10 7 4 8 11 13 9 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 476D Domed Quartz 1 2 ATS4 450 UV Lamp 1 3 ATS 5172 Sightport Lens 1 4 ATS 5173 Orange 7 OD Viewport O Ring 1 5 ATS 5171 Sightport Nut 1 6 ATS5 410 Lock Nut 1 7 ATS GDS GDS Control Box 1 8 STS 8GPM 8 Gallon Per Minute Bot...

Страница 15: ... 25 TWO PLACE DECIMAL 010 THREE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 3 27 17 B GDS 12 CUSTOMER BOM 10 11 6 4 5 2 1 3 8 9 12 13 7 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS1 759D Domed Quartz 1 2 ATS4 739 UV Lamp 1 3 ATS 5173 Orange 7 OD Viewport O Ring 1 4 ATS 5172 Sightport Lens 1 5 ATS 5171 Sightport Nut 1 6 ATS5 410 Lock Nut 1 7 ATS 12GPM 12 GPM Flow Control 1 8 STS 12GPM 12 Gallon Per M...

Страница 16: ...EE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 3 29 2017 GDS 20 CUSTOME 8 6 5 1 12 13 2 7 3 4 10 11 9 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 832D Domed Quartz 1 2 ATS4 810 UV Lamp 1 3 ATS 5173 Orange 7 OD Viewport O Ring 1 4 ATS 5172 Sightport Lens 1 5 ATS 5171 Sightport Nut 1 6 ATS5 410 Lock Nut 1 7 ATS8 544 Quartz Sleeve Black 1 2 OD ORing 1 8 ATS5 414 End Nut 1 9 STS 20GPM 20 Gallon Per Min...

Страница 17: ...GDS 2016 17 Circuit Board Layout GDS 2019 www aquat com ...

Страница 18: ... ATS 281P Circuit Bo B DRAWN TDB MATERIAL FINISH CHECKED ENG APPR MFG APPR DATE NAME TITLE SIZE DWG NO WEIGHT SCALE SH DO NOT SCALE DRAWING 4 21 16 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF AQUA TREATMENT SERVICES ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF AQUA TREATMENT SERVICES IS PROHIBITED PROPRIETARY AND CONFIDENTIAL GDS 2019 www aquat com...

Страница 19: ...s Electrical cord disconnected Check replace or outlet defective Defective U V lamp Replace lamp Defective lamp ballast Check output voltage Replace ballast Loose open circuit wire Trace out and repair Leak at quartz nipple Defective or cracked O Ring Replace O Ring O Ring not seated properly Replace O Ring Cracked quartz sleeve Replace quartz sleeve GDS 2019 www aquat com ...

Страница 20: ...inutes 3 Open the sterile bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the sample The operator must not allow his finger to touch the inside of the cap or the neck of the bottle 4 After the sample has been taken the cap should immediately be tightly placed on the sampl...

Страница 21: ...GDS 2016 21 Specifications GDS 2019 www aquat com ...

Страница 22: ...GDS 2016 22 Notes GDS 2019 www aquat com ...

Страница 23: ...GDS 2016 23 Notes GDS 2019 www aquat com ...

Страница 24: ...GDS 2016 24 Warranty GDS 2019 www aquat com ...

Отзывы: