Harmony™ Installation Manual
MACHINE INSTALLATION - OVERVIEW
This section should only be carried out by
qualified technical service personnel
.
Review the list below and perform as needed.
Explanations are located on the following pages and
in additional manuals.
Inspect machines for transport damage. Any
transport damage should be noted and witnessed
by the freight forwarder. The manufacturer accepts
no responsibility for transport damage.
Check machines for the correct paytable, glasses,
hardware configuration and that software EPROMs
are correctly installed.
Prepare the base by drilling the mounting holes.
Use the Atronic drilling template for proper
mounting hole placement.
Place and mount the machine to the base, using
the Atronic Installation Station (see next page).
Thread the power cable into the base. Do
not
connect power to the machine.
Replace shipping locks with casino specific locks.
Install and connect accounting system.
Check that all internal and external connections
are seated correctly.
Prepare coin acceptor and hopper.
Apply power to the machine.
Load paper into the printer.
Execute basic machine setup (Initial Setup)
Configure game.
Test bill and coin handling.
M
ACHINE
I
NSTALLATION
Note
:
Depending on machine
configuration or jurisdictional
requirements, additional tasks
may have to be carried out
before the machine can be put
into operation (e.g. acceptance
inspection, logicbox sealing,
etc.).
Содержание Harmony Upright
Страница 1: ...www atronic com Atronic Harmony Installation Manual Rev 1 6 June 2008 ...
Страница 6: ...6 June 2008 Harmony Installation Manual blank page ...
Страница 9: ...9 June 2008 Harmony Installation Manual blank page ...
Страница 15: ...15 June 2008 Harmony Installation Manual blank page ...