2-7
FIGURE 2-7. INSTALLATION ONTO THE ATN THOR
1. Place the DVC onto ThOR rail (Figure 2-7). Be sure to engage
the recoil lug into the groove on the mounting surface.
NOTE
Operations with qRM of DVC are similar to the operations with
qRM described in Unit 2.2.1.
2. remove the protective cap from connector socket of Thor. Insert
Dvc connector to the socket.
FIGURE 2-8. CAMERA CABLE CONNECTION
CONNECTOR SOCKET
cable connecTor
proTecTIve cap
Содержание ThOR Series
Страница 8: ...iii ...
Страница 9: ...1 1 SECTION I introduction ...
Страница 21: ...2 1 SECTION II assembly and preparation ...
Страница 28: ...2 8 ...
Страница 29: ...3 1 SECTION III OPERATION ...
Страница 37: ...4 1 SECTION IV maintenance instructions ...
Страница 43: ...4 7 ...