background image

Page 5 

Installation, Operation & Maintenance Guide - FC-400 FM

East Coast: 203-335-3700 

West Coast: 480-629-4784

CAG-04-19-001-USA

www.AtmosAir.com

2. Installation

1. 

Carefully remove the equipment from its shipping container. Inspect the main components, gasket, and tube 
for damage. Verify that the unit’s voltage rating is the same as the available voltage, 120 VAC 50/60Hz.

2. 

Install the ionization tube: Gently pull the conductor strap back to allow the tube to turn freely; screw the end 
screw of the tube into the tube-holder hand-tight. Ensure that the tube is 

FULLY SEATED

3. 

Once the tube is secure, return the conductor strap to its normal position and ensure solid, flat and continuous 
contact is made with the tube’s outer mesh (See Fig. 5a below).

4. 

Location and Orientation: Install the unit downstream of filters, coils, and fans with tubes perpendicular to 
airflow whenever possible. Contact AtmosAir Engineering for Installations outside this scope.

5. 

For in-duct installation: Verify the flange gasket is in place and in good shape to ensure the unit seals properly. 
Make a 2.5” (6.35cm) Diameter hole in the duct that the FC-400FM tube will fit into (See Fig. 1.2c). Use template 

 

AtmosAir FC-400 series equipment can be mounted on a duct FC-400 FM using the faceplate 

mounting flange and its weather-strip gasket. The units operate best when located after all filters, coils, 
and fans. Various mounting arrangements are possible; however, the available options may be limited 
due to size and configuration restrictions. When mounted on the side of a duct, the enclosure should 
not be exposed to direct sunlight or moisture. If installing outside, a weatherproof NEMA-4 enclosure 
with an access panel for servicing should be installed over the AtmosAir equipment. The AtmosAir FC-
400 FM operates on 120 VAC, 50/60 Hz. The tube and electrode contacts should not come into contact 
with any conductive surface. A minimum 1.5” (3.8cm) clearance around the tube is recommended.

2.1 Mechanical Installation

THE SECONDARY VOLTAGE TO THE IONIZATION TUBE CAN BE AS HIGH AS 

2500 VOLTS AC. DO NOT CONNECT TO POWER BEFORE THE INSTALLATION IS 

COMPLETE AND ALL PERSONNEL ARE AWARE OF IMMINENT OPERATION. ALWAYS 

DISCONNECT POWER TO THE UNIT BEFORE HANDLING ANY OF THE COMPONENTS.

WARNING

Содержание FC-400FM Series

Страница 1: ...door air to its pure natural state where no pollution or contaminants exist while reducing energy use and emmisions in the process Our Mission Breathing is Believing sm Installation Operation Maintena...

Страница 2: ...allation is complete and personnel are aware of the imminent operation Carefully read this instruction booklet before beginning the installation Follow each installation or repair step exactly as show...

Страница 3: ...9 001 USA Table of Contents 0 Important Warnings 0 2 Table of Contents 1 Product Overview 1 2 Product Diagrams 2 Installation 2 1 Mechanical Installation 2 2 Electrical Installation 3 Operation 4 Main...

Страница 4: ...verity of the pollution and odors The AtmosAir FC 400 series equipment is designed for minimal maintenance The FC 400 series has two components that require inspection and maintenance 1 AtmosAir FC 40...

Страница 5: ...ape to ensure the unit seals properly Make a 2 5 6 35cm Diameter hole in the duct that the FC 400FM tube will fit into See Fig 1 2c Use template AtmosAir FC 400 series equipment can be mounted on a du...

Страница 6: ...e tubes the system can be turned on 1 Ensure the ionization power knob is turned all the to the appropriate quadrant From low to high clockwise 2 Plug the power cord into the plug receptacle on the FC...

Страница 7: ...n hear the buzz of the tube then the unit is functioning properly If not proceed to the troubleshooting section for repair Maintain a physical distance between all personnel and the tubes while system...

Страница 8: ...AN FLAT TO TUBE contact with the tube as shown below The next step is to determine the cause of the failure or blown fuse Typically failures are caused by arcing between the inner and outer electrodes...

Страница 9: ...ration solutions AtmosAir equipment uses non thermal plasma technologies to generate bi polar Ionization that attacks and breaks down odors and contaminants More Solutions Commercial solutions start w...

Отзывы: