background image

Page 4 

East Coast: 203-335-3700 

West Coast: 480-629-4784

www.AtmosAir.com

Installation, Operation & Maintenance Guide - FC-400 FM

CAG-04-19-001-USA

1. Product Overview

The AtmosAir FC-400FM series (Flush - Mount) ionization generators are small residential-sized units 
intended for installation in air conditioning systems or in custom-designed air distribution systems in 
small commercial spaces and typical residential houses. AtmosAir equipment is effective in reducing 
odors and harmful pollutants through the introduction of positive and negative ions into the air-
stream to be treated. The number and size of the ionization units used is dependent upon the airflow, 
size of the space, and severity of the pollution and odors. The AtmosAir FC-400 series equipment is 
designed for minimal maintenance. The FC-400 series has two components that require inspection and 
maintenance:

1. AtmosAir FC-400 series base unit comp Fuse

2. Ionization tube

Because there are no moving parts, little maintenance 
is required and the systems have very low failure rates 
and minimal maintenance requirements. For more 
information, read the AtmosAir FC-400 series submittal 
documents.

1.2 FC-400 FM Diagram

AtmosAir FC-400 FM Layout:
A. 

Power Input

B. 

Ionization Tube

C. 

Blue LED Power Light

D. 

Mounting Holes

E. 

Fuse Holder

F. 

Silicone Foam Gasket

Overall Mounting Plate Dimensions:
FC-400 FM: 6” (15.25cm) L x 3.5” (8.9cm) W x 1.6” (4cm) H
Silicone Foam Gasket Seal: 0.200” (0.5cm) Thickness

A

B

D

5.5” (14cm)

6” (15.25cm)

3.5”

(9cm)

3.5”

(9cm)

1.6”

(4cm)

C

2.5” (6.35cm)

Minimum Duct

Cut-Out 

Diameter

F

E

Fig. 1.2a

Fig. 1.2b

Fig. 1.2c

Содержание FC-400FM Series

Страница 1: ...door air to its pure natural state where no pollution or contaminants exist while reducing energy use and emmisions in the process Our Mission Breathing is Believing sm Installation Operation Maintena...

Страница 2: ...allation is complete and personnel are aware of the imminent operation Carefully read this instruction booklet before beginning the installation Follow each installation or repair step exactly as show...

Страница 3: ...9 001 USA Table of Contents 0 Important Warnings 0 2 Table of Contents 1 Product Overview 1 2 Product Diagrams 2 Installation 2 1 Mechanical Installation 2 2 Electrical Installation 3 Operation 4 Main...

Страница 4: ...verity of the pollution and odors The AtmosAir FC 400 series equipment is designed for minimal maintenance The FC 400 series has two components that require inspection and maintenance 1 AtmosAir FC 40...

Страница 5: ...ape to ensure the unit seals properly Make a 2 5 6 35cm Diameter hole in the duct that the FC 400FM tube will fit into See Fig 1 2c Use template AtmosAir FC 400 series equipment can be mounted on a du...

Страница 6: ...e tubes the system can be turned on 1 Ensure the ionization power knob is turned all the to the appropriate quadrant From low to high clockwise 2 Plug the power cord into the plug receptacle on the FC...

Страница 7: ...n hear the buzz of the tube then the unit is functioning properly If not proceed to the troubleshooting section for repair Maintain a physical distance between all personnel and the tubes while system...

Страница 8: ...AN FLAT TO TUBE contact with the tube as shown below The next step is to determine the cause of the failure or blown fuse Typically failures are caused by arcing between the inner and outer electrodes...

Страница 9: ...ration solutions AtmosAir equipment uses non thermal plasma technologies to generate bi polar Ionization that attacks and breaks down odors and contaminants More Solutions Commercial solutions start w...

Отзывы: