background image

Hot Water 

on Demand

Step 4

Connect the Cold water hose to 

the inlet on the left side of the unit. 

(Don't forget to insert rubbers).

Be sure to use reinforced hose.

Be sure to close it properly.

Step 1

Find the optimal place.

Drill 4 holes and insert Plugs.

Step 2

Open the entrance cable in the 

back of the unit.

Be sure to open the side of the 

cable

Step 3

Hang the unit on the wall by 4 

screws.

Don't forget to inset the electric 

cable before.

Step 5

Connect the Hot water hose to the 

outlet (Don’t forget the rubbers).

Be sure to use reinforced hose.

Be sure to close it well.

Open the water supply and check for 

leakage around the hoses.

If there is no leakage - Go to step 6

leakage 

Check again.

Don’t continue unless you sure 

there is no leakage.

Step 6

Connect the electric cable to the 

Terminal block. 

Step 7

Close the cover by 4 short 

screws

After closing the screws

Insert the Gray Bottom cover

N

L

OUTLET

INLET

Atmor Super 900 - Assembly Steps

FREEPHONE 0800 101 201   /   [email protected]  /  www.atmor.co.nz

External PRD installed

at water inlet

Отзывы: