
1.
3.
2.
FRONT ENDWALL
REAR ENDWALL
outside
greenhouse
inside greenhouse
2'' x 2''
endwall stud
welded
stanchion
groundraill
tek screw
thru stud &
stanchion
horizontal purlin
1.install front/rear endwall studs
over the welded stanchions and
secure using #14 tek screws
2. view from inside and at the
end rafter. Connect the endwall
studs to end rafters using 2"
brace bands &
5
16
" x 1
3
4
" carriage
bolts.
3. when framing a door or fan
opening, install "L" brackets on
the outside of the of the
frame-out.
1.
2.
3.
Door
Opening
"L" bracket on outside of
door studs
groundrail
door stud
endwall horizontal
purlin
door
header
door stud
L bracket
shutter frame out
fan frame out
16'
5'
Framing End walls -
typical end walls shown below
Endwall studs will be pre-cut
. Door headers, Door studs and horizontal
purlin will have to be field cut.
Refer to the page(s) labeled Endwall Layouts for proper placement and
measurements of your purlin & door studs.
The illustrations below show connection details for attaching door studs to
the groundrail and rafter, also the placement of "L" brackets when framing
an opening for a door, fan or shutter.
PLEASE REFER TO THE FOLLOWING PAGES FOR SPECIFIC
END WALL LAYOUTS AND FRAME OUT MEASUREMENTS
end
rafter
end wall
stud
nut
2" brace
band
5
16
" x 1
3
4
"
carriage
bolt
Page 10