rebar continuous at perimeter
laps a minimum of 25'' with
4 ties evenly spaced
FOUNDATION - (Typical)
IMPORTANT:
It is very important to begin with a level surface. Check your foundation to ensure it
is level at every point. You must assure your foundation is square and level before beginning
assembly.
After choosing a location, proper preparation of the site is essential. The site
must be
level.
The
Scholar
greenhouse can be mounted two ways: on concrete slab or concrete footer.
OVER HEAD VIEW
concrete slab
turndown varies
3''
4'' slab
45°
END VIEW OF TYPICAL CONCRETE SLAB
When pouring concrete slab be sure to make the slab
10'' longer and 8'' wider
than your order size
.
An
example
is shown below:
OVERHEAD VIEW concrete slab
. Set front/rear groundrail 4'' inward from edge of
concrete and side groundrails are set 4'' inward from edge of concrete.
turndown
varies
12''
3''
Clearance
3" Clearance
rebar continuous at perimeter
laps a minimum of 25'' with
4 ties evenly spaced
12''
10"
WIDTH + 8"
FOOTER - (Typical)
When pouring footer be sure to make the footer
10'' longer and 8'' wider
than your order size
.
Example
is
shown below. Set front/rear groundrail 4'' inward from edge of concrete and side groundrails are set 4'' inward
from edge of concrete.
4" from edge
4" from edge
ground rails
END VIEW OF TYPICAL FOOTER
OVER HEAD VIEW
FOOTER
10"
WIDTH + 8"
12"
12"
groundrails
3'' Clearance
Clearance