7.11 Routing Latch Release Cable
• Install the top pulley brackets on both column extensions as shown;
• Route the straight end of the latch release cable (the end without the loop)
through the hole in the offside latch, down under the cable guide, over the
bracket at the top of the offside column, over and down the bracket on the
power-side column, and through the latch on the lock release on this side;
• Tighten the cable adjusting nuts after pulling slack out of the cable.
Figure 13 – Routing Latch Release Cable
7.12 Installation Of Power Unit
• Attach the power unit onto the bracket on
the power side column;
• Secure it using M8X30 screws, M8 nuts and
the washers;
• Make sure to keep the power unit clean.
Содержание PVL12
Страница 1: ...Replace This With Cover PDF...
Страница 13: ...Technical Specification 13 PVL12 Figure 3 Layout...
Страница 16: ...Technical Specification 16 PVL12 Figure 6 Electrical Diagram 220V 50Hz 60Hz 1Ph...
Страница 19: ...Safety 19 PVL12 Figure 7 Safety Signs...
Страница 48: ...Part List 48 PVL12 Figure 24 Hydraulic Line...