Atlantic 74227 Скачать руководство пользователя страница 4

Eco-Blox Reservoir Installation

Once you have determined the proper basin size for your project, decide on the shape of 
the reservoir and the placement of the vault. The vault should be placed away from the 
waterfall, where the lid can be accessed easily. Tailor the excavation to the shape of the 
reservoir, making the excavation at least 6-8” larger on all sides, with vertical walls to make 
installation and backfilling easier. Dig down 18” for the Eco-Blox plus another 

2” - 

4” for 

gravel. Level and tamp the bottom of the excavation. The area under the Pump Vault will 
need to be deeper depending on the Vault used. Test fit the Eco-Blox and Vault in the 
excavation and mark where the Vault will be located. If using the PV1700 on the outside 
of a rectangular reservoir, you may wish to notch into the sidewall of the excavation to fit 
the Vault. The PV15000 exactly replaces one Eco-Blox to simplify installation. Following 
the mark, excavate an additional 4” for the PV1700, extending the edges of the pocket 
created a couple of inches to ensure the bottom of the Vault will sit down completely in the 
recess. Tamp the bottom of the pocket. For the PV15000, excavate an additional 7 1/2” and 
tamp. This additional depth will recess the Pump Vault lower than the rest of the reservoir, 
ensuring that the pump in the Vault will stay submerged. Carefully line the excavation first 
with underlayment, then install the EPDM liner. Another layer of underlayment may be 
added on top of the liner for greater security before setting the Eco-Blox. The tops of the 
Eco-Blox should be level.

NOTE: For best results, install the pump and optional Autofill before installing the Vault 
in the reservoir following the instructions in the next sections.

Install the plumbed Vault in the excavation, ensuring it sits properly in the recess. Gather and 
fold each layer of underlayment and liner on top of the Eco-Blox as if wrapping a gift. Backfill 
the space around the wrapped Eco-Blox and Vault to lock them into place, using sand or 
clean fill in 6” layers. Add and compact fill evenly all the way around to avoid pushing the 
Eco-Blox out of alignment. Top the liner and basin with ¾” or larger gravel or decorative stone. 
Smaller, more decorative gravel, landscape glass, etc. can be used to cover the top of the 
basin, provided a mesh with smaller openings is installed beneath the material. 

Eco-Blox Small / PV7500 Installation

Because the reservoir should accommodate at least three times the transitional volume, 
we always recommend using the Eco-Blox for Pond-free reservoirs. However, there may 
be situations where the Eco-Blox SMALL must be used with the PV7500 Pump Vault. 
WARNING - Eco-Blox Small hold only half the volume of full-size Eco-Blox. With only half 
as much water stored, there is a much greater chance of the pump running dry as water 
splashes or evaporates. 

4

Top of liner

Top of water

Transitional 

Water

X

Improper Streambed Construction

Improper construction greatly increases the amount of transitional water. In the example 
below stone, gravel and foam are used to create a waterfall. These barriers are never fully 
watertight. When the pump is turned off, the water will drain down to the highest point 
of the liner. When started, the system will require much more than 3-4” of water to cycle. 
More transitional water means a much larger reservoir will be required.

Содержание 74227

Страница 1: ...PV1700 74235 PV7500 89583 PV15000 89584 PVEXT 89858 SP1600 74271 SP1900 74227 SP2600 74228 SP3800 74229 Product Manual Manuel du Produit Manual del Producto 1 330 274 8317 www ATLANTIC_OASE com PF...

Страница 2: ...By calculat ing the transitional water volume then designing the reservoir to hold at least three times as much the water level in the reservoir will never drop by more than one third when the system...

Страница 3: ...drops as the pump turns on and the stream fills the smaller the reservoir can be Proper streambed construction can reduce the amount of water needed Since transitional volume is determined by how hig...

Страница 4: ...TE For best results install the pump and optional Autofill before installing the Vault in the reservoir following the instructions in the next sections Install the plumbed Vault in the excavation ensu...

Страница 5: ...l Plumbing the PV1700 Pump Vault The PV1700 is Atlantic s most compact easy to install pump vault The PV1700 features an incredibly strong enclosure pump discharge step fittings molded into each side...

Страница 6: ...tubing size and port locations to any application with multiple drill points and flat panels The top of the Vault accommodates Auto Fill and overflows Flat panels at the bottom accept 3 bulkheads for...

Страница 7: ...port for a lip rock The Fastfalls will support the weight of gravel and rocks stacked directly on top of the unit Consider covering the whole unit with a single sizeable overhanging capstone or stack...

Страница 8: ...the PV7500 Eco Rise System The size of the reservoir depends on the size height and number of the decorative fountain elements For a general rule of thumb the basin should extend out at least twice t...

Страница 9: ...the discharge pipe will be used Discharge Pipe Perfect Cut Reference Chart Shaded areas denote pumps that exceed maximum flow rates or dimension for use with the corresponding Pump Vault Use of this...

Страница 10: ...isused or abused product voids this warranty Pump Vault Accessories AF1000 Auto Fill Kit and TR215CV Triton Check Valve included in this manual carry a one year warranty This warranty excludes labor c...

Страница 11: ...ins trois fois plus le niveau d eau dans le r servoir ne baissera jamais de plus d un tiers lorsque le syst me est d marr gardant la pompe immerg e en toute s curit tout moment En supposant qu il faud...

Страница 12: ...r duire la quantit d eau n cessaire tant donn que le volume de transition est d termin par la hauteur des pierres du d versoir au dessus du rev tement la minimisation de cette hauteur r duit la quanti...

Страница 13: ...PDM Une autre couche de sous couche peut tre ajout e au dessus du liner pour plus de s curit avant la pose de l Eco Blox Les sommets de l Eco Blox doivent tre de niveau REMARQUE Pour de meilleurs r su...

Страница 14: ...s le Vo te Choisissez l un des points de forage pour installer un remplissage automatique AF1000 en option voir le manuel 14 D BORDEMENT RACCORD D TAPE AF1000 REMPLISSAGE AUTOMATIQUE Installation PV15...

Страница 15: ...e personnaliser la taille des tubes et les emplacements des orifices pour n importe quelle application avec plusieurs points de per age et des panneaux plats Le haut du Vo tes accueille le remplissage...

Страница 16: ...es vis doivent seulement tre bien ajust es pour que le silicone fasse un joint Appliquez du silicone sur les filetages de l adaptateur pour filetage m le MTA Vissez le MTA dans l entr e jusqu ce qu il...

Страница 17: ...pompe Des emplacements de montage sont pr vus de chaque c t du PV7500 Suivez les instructions de remplissage automatique pour l installation Excavation et installation de PV7500 Le syst me Eco Rise L...

Страница 18: ...1mm au rep re Perfect Cut sp cifi pour la pompe utilis e acez la Vo te de Pompe dans la poche profonde puis installez l Eco Blox Le haut du champ de blocs doit tre de niveau Tirez la doublure bien aju...

Страница 19: ...e situ environ 1 38mm 2 51mm au dessus du niveau d eau de fonctionnement normal de l tang Garantie Tous les Vo tes de Pompe et FastFalls Atlantic sont garantis vie Cette garantie est tendue uniquement...

Страница 20: ...greso al dep sito para completar el ciclo La cantidad de agua necesaria para completar este ciclo es el volumen de agua en transici n Si el dep sito es demasiado peque o el arroyo es demasiado grande...

Страница 21: ...el arroyo lo m s peque o puede ser el dep sito La construcci n adecuada del cauce puede reducir la cantidad de agua necesaria Dado que el volumen de transici n est determinado por la altura de las pi...

Страница 22: ...rior del Eco Blox debe estar nivelada NOTA Para obtenerlos mejores resultados instale la bombayelAutollenado opcional antes de instalarla C mara en el dep sito siguiendo las instrucciones de las sigui...

Страница 23: ...I N ESCALONADA AF1000 LLENADO AUTOM TICO Instalaci n de tuber as en la C mara de Bombas PV1700 La PV1700 es la C mara de Bomba m s compacta y f cil de instalar de Atlantic El PV1700 cuenta con un reci...

Страница 24: ...aceptan mamparas de 3 76mm para drenajes de desechos y aplicaciones de plomer a personalizadas Decida la configuraci n que mejor se adapte a la aplicaci n luego instale la bomba las tuber as y el llen...

Страница 25: ...solo necesitan estar ajustados para que la silicona selle Aplique silicona en las roscas del adaptador de rosca macho MTA Atornille el MTA en la entrada hasta que quede apretado Use pegamento PVC no...

Страница 26: ...ciones de montaje se proporcionan a ambos lados del PV7500 Siga las instrucciones del Autollenado para instalar Excavaci n e Instalaci n de PV7500 El Sistema Eco Rise El tama o del dep sito depende de...

Страница 27: ...egue 2 51mm a la marca corte exacto especificada para la bomba que se est utilizando PV1700 PV7500 PV15000 TT1500 B B H TT2000 B B H TT3000 B B H TT4000 B B H TT5000 0 0 5 TT6000 0 0 5 TT7500 N A N A...

Страница 28: ...l producto completo debe devolverse al lugar de compra acompa ado del recibo original KIT DE LLENADO AUTOM TICO AF1000 Se han proporcionado puntos de perforaci n o reas planas para la ubicaci n correc...

Отзывы: