ATI
Q46H/63 Combined Chlorine System
Part 4 – Electrical Installation
27
O&M Manual
Rev-K (11/18)
4.5
Junction Box Connection
Installations where the sensor is to be located more than 25 feet from the monitor (max. 100 feet)
require the use of a junction box. The junction box is shown in, and is supplied with two cable
glands on the bottom of the enclosure.
Note: If sensor is experiencing Low-Slope or Low-Output conditions, due to poor Earth
Ground Connections, move the Shield connection from P/S board to alternate
location on lid, where indicated with an “S”.
Figure 19 - Junction Box Interconnect Wiring