![Athena 850-BL EVO Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/athena/850-bl-evo/850-bl-evo_translation-of-original-instructions_2998368083.webp)
PAGE
83
ALMAC s.r.l.
4.1.6
Checking the oil level in the engine
Check the engine oil level before starting it, or when more than 5 minutes have
gone by after stopping it.
Pull out the oil level indicator, clean it by wiping it and reinsert it.
Pull the oil level indicator out again and check.
For more information, consult the use and maintenance manual of the engine.
4.1.7
Folding the railings
The platform is provided with folding railings which facilitate the transport and
the passage inside vehicles. To perform the folding, unlock the pins located on
every railing according to a pre-determine sequence.
1
•
Extend the work platform
according to the instructions
given in sect.
4.1.4 Extending
the work platform
until it has
been fully extended
2
•
Remove the remote push-
button
•
Unlock the fastenings of the
front railing (see following
pages)
•
Fold the railing according to
the figure
Содержание 850-BL EVO
Страница 7: ...PAGE 7 ALMAC s r l MAXIMUM WORKING HEIGHT TRAVELLING NOT PERMITTED H1 H2 G3 H3 H4 G4 G1 L1 G2 ...
Страница 10: ...PAGE 10 ALMAC s r l ...
Страница 23: ...PAGE 23 ALMAC s r l ...
Страница 49: ...PAGE 49 ALMAC s r l 35 Combustion engine 36 Fuel tank 37 Bi levelling chassis 37 38 ...
Страница 78: ...PAGE 78 ALMAC s r l ...
Страница 80: ...PAGE 80 ALMAC s r l ...
Страница 122: ...PAGE 122 ALMAC s r l In this configuration the oil level must be as shown in the figure below A 60mm ...
Страница 144: ...PAGE 144 ALMAC s r l ...
Страница 145: ...PAGE 145 ALMAC s r l ...
Страница 146: ...PAGE 146 ALMAC s r l ...
Страница 147: ...PAGE 147 ALMAC s r l ...
Страница 148: ...PAGE 148 ALMAC s r l ...
Страница 149: ...PAGE 149 ALMAC s r l ...
Страница 150: ...PAGE 150 ALMAC s r l ...
Страница 151: ...PAGE 151 ALMAC s r l ...
Страница 152: ...PAGE 152 ALMAC s r l ...
Страница 159: ...PAGE 159 ALMAC s r l ...
Страница 162: ...PAGE 162 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Страница 164: ...PAGE 164 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature ...
Страница 178: ...PAGE 178 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...