PAGE
163
ALMAC s.r.l.
8.2
Report register
Report register
The Report register is issued to the platform user with reference to:
➢
technical standard UNI EN280:2015
➢
Legislative Decree D.Lgs 17/2010
–
Implementation of Machinery
Directive 2006/42/EC
The purpose of this Register is to record events concerning the life of the
machine; in detail:
•
Mandatory routine inspections (INAIL, ASL, authorized bodies)
•
Maintenance and obligatory inspections to check the integrity and structure
of the machine and protection and safety systems
•
Transfers of ownership, to be notified to the competent INAIL (former
ISPESL) department
•
Supplementary maintenance or replacement of important parts of the
machine
Содержание 850-BL EVO
Страница 7: ...PAGE 7 ALMAC s r l MAXIMUM WORKING HEIGHT TRAVELLING NOT PERMITTED H1 H2 G3 H3 H4 G4 G1 L1 G2 ...
Страница 10: ...PAGE 10 ALMAC s r l ...
Страница 23: ...PAGE 23 ALMAC s r l ...
Страница 49: ...PAGE 49 ALMAC s r l 35 Combustion engine 36 Fuel tank 37 Bi levelling chassis 37 38 ...
Страница 78: ...PAGE 78 ALMAC s r l ...
Страница 80: ...PAGE 80 ALMAC s r l ...
Страница 122: ...PAGE 122 ALMAC s r l In this configuration the oil level must be as shown in the figure below A 60mm ...
Страница 144: ...PAGE 144 ALMAC s r l ...
Страница 145: ...PAGE 145 ALMAC s r l ...
Страница 146: ...PAGE 146 ALMAC s r l ...
Страница 147: ...PAGE 147 ALMAC s r l ...
Страница 148: ...PAGE 148 ALMAC s r l ...
Страница 149: ...PAGE 149 ALMAC s r l ...
Страница 150: ...PAGE 150 ALMAC s r l ...
Страница 151: ...PAGE 151 ALMAC s r l ...
Страница 152: ...PAGE 152 ALMAC s r l ...
Страница 159: ...PAGE 159 ALMAC s r l ...
Страница 162: ...PAGE 162 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Страница 164: ...PAGE 164 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature ...
Страница 178: ...PAGE 178 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...