Installation and Operation
Installing the UPS is as easy as following the steps shown. Be
aware of the Power Switch must be kept in the “ON” position,
otherwise, the UPS will be disabled and your equipment will not be
protected during a power failure.
1.
Inspection
Remove the UPS from its packaging and inspect it for damage that
may have occurred during shipping. If any damage is discovered,
repack the unit and return it to the place of purchase.
2.
Placement
Install the UPS unit in any protected environment that provides
adequate airflow around the unit, and is free from excessive dust,
corrosive fumes and conductive contaminants. Do not operate your
UPS in an environment where the ambient temperature or humidity is
high. On the other hand, place the UPS unit away from monitor at least
20cm to avoid interference.
3.
Charging
This unit is shipped from the factory with its internal battery fully
charged. however, some energy may be lost during shipping so the
battery should be recharged before using it. Plug the unit into an
appropriate power supply and allow the UPS to charge fully by leaving
it plugged in for 8 hours.