![ATC SunRay RF Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/atc/sunray-rf/sunray-rf_installation-and-operating-manual_2996263008.webp)
8
Connect the power supply cable to the terminals
L
and
N
of the Power Monitor. Remember to
disconnect the power supply from the circuit
breaker where the Power Monitor will be
connected.
Place the Power Monitor in the DIN rail on your
control panel where there is available space.
1
Connect the other two ends of the cable to the
output of a circuit breaker switch, preferably a
lighting type, minimum 5A/230V,
2
The said
circuit breaker must be arranged so that it is easy
to access and it must be marked so that it can
be recognised as the equipment disconnection
device.
Connect the jack connector of the Power Monitor
measurement clamp to the connector on the top of
the Power Monitor.
3
Open the clamp as indicated below and place it
around the main power supply cable from the
main safety switch on the control panel.
4
Installation instructions
L N
TEST
TEST
Power
Monitor
Link
short press
LED status
OFF · not linked
Blink 3s.· Linked
Blink 0.5s.· Lost
L N
3
1
2
4
Содержание SunRay RF
Страница 12: ...12...
Страница 14: ...14 Notes about installation...
Страница 15: ...15 Notes about installation...