![Atag Teppan Yaki TY6011M Скачать руководство пользователя страница 126](http://html1.mh-extra.com/html/atag/teppan-yaki-ty6011m/teppan-yaki-ty6011m_instructions-for-use-manual_2995472126.webp)
contents
positioning plate (1x)
control knob (2x)
conical spring (2x)
rosette (2x)
light ring (2x)
screw (4x)
sealing ring (2x)
screw (4x)
pin (2x)
pin Z
hole Y
spring (2x)
nut M4 (2x)
control box
(A)
(B)
(D)
(C)
(E)
INSTALLATION INSTRUCTIONS
Top-stone
EN 30
3. Use the screws supplied to fasten the positioning plate (A)
against the bottom of the worktop so that the holes are
aligned.
4. When mounting the knobs into the worktop the sealing
rings (B) should be mounted underneath the light rings.
5. Place the light rings (B) from the top through the holes in
the worktop and fasten them from the top with the screws
supplied.
6. Place the springs on the pins (C) and push them from the
bottom through the light rings in the worktop.
7. Place the conical springs on the control knobs (D).