background image

 Operating instructions ATAG Q-Solar

 Operating instructions ATAG Q-Solar

9

The Q-Solar is provided with a frost protection for
boiler and cylinder as standard.
In case of frost we advice you to switch (

) on the

circulation pump of the boiler continuously to reduce
the chance for freezing. This is not relevant for the
solar circuit.

The solar circuit

Frost protection

With the solar main switch on the Control Tower the
solar circuit can be switched on or off. Switching off
the solar circuit can be necessary in case of
maintenance activities by your installer. This switch

The Reset key

will not shut off the heating and/or DHW supply.

The control panel is provided with a reset key. When
a fault occurs it will be shown by the flashing E
(Error)  with a number code after which the boiler is
shut down. After pressing the reset key you can try
to start the boiler again. If the error message keeps
occurring contact your installer.

12

Replenishing the central heating system

The central heating installation needs to be filled with potable (drinking) water.
For  topping up the installation you use the filling loop according to the following
procedure:

(If in any doubt please contact your dealer)

1 Switch all functions off (heating, DHW and pump);

2 Briefly push the 'STEP'-button: P x.x = water pressure in bar;

3 Slowly open the filling loop (Indication on display increases);

4 Fill up slowly to 1.5 to 1.7 bar;

5 STOP appears on the display;

6 Close the filling loop;

7 De-aerate the complete installation, start at the lowest point;

8 Check the water pressure and if necessary top it up;

9 Close the filling loop;

10 Activate functions required (heating 

, DHW 

 and/or pump

 );

11 If A xx appears on the display, wait for 17 minutes;

12 Check the waterpressure and if necessary top it up to 1,5 to 1,7 bar

13 Close the filling loop;

14 Press the ‘STEP’-button;

15 Be sure that the filling loop is closed.

After the automatic de-aeration programm (A xx) is finished the boiler will return
to the 

Good 

reading or Technical reading.

Содержание Q-Solar

Страница 1: ...tor for UK ATAG Heating UK Ltd Unit 3 Beaver Trade Park Quarry Lane Chichester West Sussex PO19 8NY Phone 01243 815 770 Fax 01243 839 596 E mail info atagheating co uk Internet www atagheating co uk Ditributor for Ireland Total Energy Management Ltd Unit 9 Ballybritt Industrial Estate Monivea Road Galway Ireland Phone 091 769174 Fax 091 769485 E mail info tem ie Internet www tem ie ...

Страница 2: ... Reset key 7 The boiler display 8 Water pressure in the central heating system 9 Replenishing the central heating 10 Turning the boiler off 12 Error maintenance and warranty 13 Adjustments 14 Important It is in your own interest that we should know that you have an ATAG boiler Please fill out the warranty card completely and send it back to us Then we can be fully at your service 19 ...

Страница 3: ...servicing instructions manual for the installer Readthismanualfullybeforeoperatingtheboiler In case of doubt or errors contact your installer ATAG Heating reserves the right to change the specifications and dimensions without prior notice Work on the boiler must be carried out by a competent person Ref Gas Safety Installation and Use using correctly calibrated instruments with current test certifi...

Страница 4: ...nal heating 60 C 04 full under floor heating 50 C factory setting Adjusting the type of installation The boiler is designed in such a way that it will adjust itself automatically to what is necessary for a normal heating system In some cases the installation may have convectors or complete underfloor heating One can easily choose heating installation adjustments appropriate for the system such as ...

Страница 5: ...s soon as this temperaturedifferencehasdroppedtoapprox 2 C The pump also switches off automatically as soon asthecylinderhasreachedatemperatureof80 C The controller allows the pump to restart once the temperature of the cylinder has dropped to 75 C Room sealed boiler The boiler retreives its combustionairfromoutside then discharges the flue gasses to the outside Condensing Retrieves heat from the ...

Страница 6: ...ertotheuser manual ATAG BrainQ Example SEDBUK ClassA Normally the pipes between absorber and cylinder are insulated However it needs your attention that the pipes during operation can be extreemly hot 120 C 15 Error maintenance and warranty If a fault is detected the boiler will be blocked This will be reflected by an alternate display of Good with an Eof Error or a BL of Blocking and a number cod...

Страница 7: ...od Adjust the thermostat to the holiday period See the BrainQ user manual The hot water facility can beswitchedoffbymeansoftheprogramkey on the control panel Re setting the central heating system Switch off the three program keys when these are activated Switch off the power supply When the boiler is being drained one should take into account that a part of the heating water will remain in the boi...

Страница 8: ...D s On the left side of the boiler there is a small door Throughthetransparentpartyoucanseetheboiler statusonthedisplay Afteropeningthisdooryouwill find the function keys On the right side of the door you will find an instruction card in a sleeve with an explanation of the display messages and function keys This is described below 13 The boiler will not function directly The automatic de aeration ...

Страница 9: ...ntact your installer 12 Replenishing the central heating system The central heating installation needs to be filled with potable drinking water For topping up the installation you use the filling loop according to the following procedure If in any doubt please contact your dealer 1 Switch all functions off heating DHW and pump 2 Briefly push the STEP button P x x water pressure in bar 3 Slowly ope...

Страница 10: ...essure in bar If a fault is found the same is shown as described under TheGoodreading Selecting the Technical or Good reading Press the Step key for 5 seconds The display will change from the Good reading to the technical reading or vice versa 11 Water pressure in the central heating system The installation will function optimally with a water pressure of between 1 5 and 1 7 bar Ifthewaterpressure...

Отзывы: