![Atag Premier E-HR 24 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/atag/premier-e-hr-24/premier-e-hr-24_installation-and-servicing-instructions_2995197013.webp)
Installation instructions E-SHR series page 13
7
Electrical connection
The appliance complies with the CE Machinery Directive
89/392/EEC. The EC Low Voltage Directive 72/23/EEC
and the EC EMC Directive 89/336/EEC.
A 230V -50Hz mains electrical supply is required fused
externally at 5A.
The installation must continue to comply with:
United Kingdom:
- the national rules for electrical installations.
Ireland:
- the ECTI national rules for electrical installations
The appliance must be connected to an earthed socket.
this must be visible and within reach.
The following general stipulations also apply:
- No changes may be made to the wiring of the
appliance;
- All connections should be designed in accordance
with the enclosed regulations.;
- Should it be necessary to change it, the mains power
supply cable may only be replaced with an ATAG
mains power supply cable (item No. S4477300).
The ATAG room thermostat and controls must be
connected to their allocated connections. All other
types or makes of room thermostats or controls
which are used must have a Volt free contact.
230 Volts for
external pump
mains power
supply
230 Volts for
external control
230 Volts
internal or external
three-way valve motor
and cylinder sensor
ATAG
room thermostat
On/off thermostat or
control (Volt free)
Connection block
ATAG outside sensor
External safety
contact
24 Volts
maximum 100 mA
When using an on/off thermostat or control, it is possible
that an anticipating resistance must be installed in order
to prevent too high temperature fluctuations. As a stand-
ard rule this means mercury thermostats. This resis-
tance wire is present in the Control Tower and must be
connected to clamps 23 and 27. The anticipating resis-
tance in the room thermostat has to be set at 0.11 A.
For more detailed questions regarding the components
which are not supplied, the country distributor should be
contacted.
All electrical connections must be done on
the connection block in the boiler.