ATAG
25
Instructions for the Installer
Installation and connection must be
done in compliance with the
regulations in force. Any interventions
must be carried out when the appliance
is switched off. Only accredited
engineers may work on the appliance.
The manufacturer disclaims any
liability if the safety measures are not
observed.
Connecting to the electrical supply
Before connecting to the electrical supply, please
make sure:
-
The fuse and the domestic electrical installation
must be designed for the max. load of the
appliance (see rating plate).
-
The domestic electrical installation must be
equipped with a proper earth connection in
accordance with the regulations in force.
-
The socket or the multi-pole off switch must
be easy to access after the appliance has been
installed.
The appliance is supplied with a connection cable
incorporating a standard plug, suitable for the to-
tal electric load shown on the rating plate. The
plug is to be inserted into a suitable wall socket.
If you require a direct connection to the electric
network (mains), it will be necessary to fit between
the appliance and the mains an omnipole switch,
with a minimum gap between contacts of 3 mm,
suitable for the required load and in compliance
with rules in force. The green & yellow ground wire
must not be interrupted by the switch and it should
be 2-3 cm. longer than the other cables.
The mains cable and plug as supplied are to be
connected to a shockproof socket (230 V~, 50
Hz). The shockproof socket must be installed in
accordance with the regulations.