GB 20
INSTALLATION
You are advised to install this product with the help of a second person.
A
A
2--
Ø
(4X)
CO D. 3 DIMAF I
2--
A
C
B
- Unpack the structure and remote the two
screws
A
to separate the top part from the
bottom one (Fig.1).
- Take the hole template and place it on the
ceiling, with the arrow on the same side as the
hood’s controls (Fig.2).
For the mounting work, use screws and
expansion dowels suited to the type of wall
(e.g. reinforced concrete, plasterboard, etc.).
If screws and dowels are provided with the
hood, make sure beforehand that these are
suitable for the type of wall on which the hood
is to be mounted.
- Drill the four Ø 8 holes in the ceiling and insert
the four dowels.
- Prepare the air evacuation hole
A
(Fig.3).
- Connect the flexible pipe to hole
A
.
- Take bracket
B
and fasten it on the ceiling with
the four screws
C
(Fig.4).
Fig.4
Fig.3
Fig.1
Fig.2
Содержание ES1011MAM
Страница 2: ......
Страница 23: ...NL 23 INSTALLATIE A B Verbind de onderste schacht A met de bovenste B zoals weergegeven in Figuur 11 Fig 11 ...
Страница 52: ...FR 28 ...
Страница 74: ...DE 24 INSTALLATION A B Verbinden Sie den unteren Rauchabzug A mit dem oberen Abb 11 B siehe Abb 11 Abb 11 ...
Страница 78: ...DE 28 ...
Страница 100: ...GB 24 INSTALLATION A B Connect the bottom chimney A to the top one B as shown in Figure 11 Fig 11 ...
Страница 104: ...GB 28 APPENDICE ...