6
Pretest operate description
1
2
3
Visual inspection:
1. Inspect M/B have broken,oxidized…..
(Please refer
Visual inspection description
)
2. Customer induce or not.
(Please refer
Customer Induce Description
)
3. If any M/B components failed to work
after inspection,please paste the arrow
stacker and write on Diagnostic Card
If Visual inspection is OK.
Please plug in the power connector on Motherboard
Plug in CPU test Card on CPU_Slot(Socket) and
Turn on power supply.
Содержание RMA Pretest
Страница 9: ...9 10 11 12 1 Turn OFF the power supply 2 Plug in PS2 Keyboard Plug in PS2 Mouse Plug in COM_ports ...
Страница 12: ...12 19 Push SWBO_ASUS the PWR SW switch button once will switch on the system and test motherboard function ...
Страница 14: ...14 Send M B to Asus RMA Paste Diagnostic Card on PCI Solt 4 5 ...
Страница 18: ...18 e Choose the proper model name to execute the pretest program For example Key in 1 for P2B ...
Страница 19: ...19 Visual Inspection ...
Страница 21: ...21 INSPECT M B PCB Check if the M B PCB is broken INSPECT M B BACK PCB Check if the PCB trace is broken ...
Страница 27: ...27 PCB Trace Scratched 1 PCB Trace Scratched 2 Consecutively three or more traces scratched ...
Страница 28: ...28 PCB Oxidation 1 PCB Oxidation 2 If the PCB is oxidized by end user Ex Drinks coffee ...
Страница 29: ...29 PCB Breakage If the M B PCB is broken by end user PCB Burning 1 If the M B or VGA PCB is broken by end user ...
Страница 31: ...31 Test Tools Introduction ...
Страница 40: ...40 CD ROM Test Tools Name M017 CD_ROM TX97 Part Number 15 093004001 ...