20
Chapter 2: Basic Operation
Getting Star ted
Before you turn on the server, make sure that you have completed
the basic system connections. Follow these steps when starting the
server.
Connect a Monitor
Connect a VGA-compatible
monitor by plugging the 15-pin
video cable to the video-out port
(blue) on the back of the server.
Check Power LED
After powering on the server,
check if the power LED lights up.
Also make sure that all warning
LEDs are normal.
Turn the Power ON
Power ON the server by pressing
the power button on the front
panel.
Connect Power Cords
Connect two power cords to the
AC power connectors on the back
of the server, then plug the power
cords to a grounded source.
TIP: The utilize the redundancy of
the power cords, connect each one
to a different source, for example,
two separate UPS connected to
two separate power sockets.
Video-Out (VGA) Port
Power Button
Redundant Power Supply AC In
Power
LED
Fan/Temp
LED
Hard Drive Warning (Amber)
Содержание AP2400R
Страница 1: ...Dual Pentium III 2U Rackmount Server AP2400R Reference Guide ...
Страница 18: ...18 Chapter 1 System Overview ...
Страница 40: ...40 Chapter 3 Hardware Setup ...