5.2    If snow is present, a soft-bristled brush with soft bristles may be used to clean the surface of 

the modules. 

5.3    Regular  electrical  and  mechanical  inspection  by  a  licensed  professional  will  keep  the 

system safe and operating at maximum efficiency. 

5.4    Recommended PV module Clean-up period 

To get high output performance, PV module needs to be cleaned-up periodically as below: 

① 

Normal: Minimum one time per every month; Dust weather: Right away after the dust 

wind; 

② 

The period of the PV module cleaning shall be determined by the condition of the 

weather & pollution. O&M operator shall keep a record of weather condition everyday with 

data. 

5.5    Condition of Cleaning 

5.5.1  Use clean water or filtered water with soft type material (a sponge) to wipe the PV 

module. Never use chemicals on the surface of the module. 

5.5.2  Cleaning after sunset or before sunrise is recommended for safety of O&M operator 

shock from heat stroke. 

5.5.3  Do not use abrasive powder, abrasive cleaners, scrubber cleaners, polishers, sodium 

hydroxide, benzene, nitro-thinners, acid or alkali and other chemical substances. 

5.5.4  Do not clean broken glass or modules with broken lines or exposed wires, as it may 

cause the electric shock.   

 

 

 

 

 

 

 

 

 

 

 

Содержание CHSM60M(DG)/F-B

Страница 1: ...nt com Crystalline Silicon PV Module Installation Manual 1 Introduction 1 1 Purpose 1 2 Limitation of Liability 1 3 Precautions for Installation 2 Safety 2 1 General Safety 2 2 Installation Safety 3 M...

Страница 2: ...ense arising out of or in any way connected with such installation operation use or maintenance Chint Solar reserves the right to change the manual without prior notice 1 3 Precautions of Installation...

Страница 3: ...ooftop the number of each stack is suggested no more than 20 In case of the poor load bearing capacity it s recommended that the designer and or installer check with the structural engineer or archite...

Страница 4: ...e modules 2 1 10 Do not scratch or hit at the back sheet the glass the terminal box Do not pull the cables or touch them with bare hands 2 1 11 Do not drill holes in the frame or scratch the anodized...

Страница 5: ...t the mounting surface touching the junction box 2 2 17 Standing on the solar PV module is forbidden and also prohibit installation tools or other objects hitting surface of the solar PV module 2 2 18...

Страница 6: ...s available as shown in figure 3 While installing the module frame should be parallel to the mounting rack to avoid casting shadow on the rear side as shown in figure 4 Figure 1 Figure 2 Figure 3 Figu...

Страница 7: ...Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com Figure 5 3 2 2 Clamping on the frame surface 3 2 2 1 Double glass module During the installation of bifacial modules the fram...

Страница 8: ...e added for additional support 3 As for above figure 7 indicates the allowable installation range of the aluminum clamp the recommended installation location is 50 200mm For this installation the modu...

Страница 9: ...omponents b The bar s top surface contacted with module frame should come with grooves compatible with an M8 bolt c If the bars do not come with grooves holes of a suitable diameter may need to be dri...

Страница 10: ...roduce more current and or voltage than reported at standard test conditions Accordingly the value of Isc marked on this module should be multiplied by a factor of 1 25 when determining component cond...

Страница 11: ...wire around the bolt Note that the copper wire cannot be attached directly to the aluminum 4 2 4 Put the bolt through the cut washer and then through the hole in the aluminum frame 4 2 5 Add the spri...

Страница 12: ...th Dust weather Right away after the dust wind The period of the PV module cleaning shall be determined by the condition of the weather pollution O M operator shall keep a record of weather condition...

Страница 13: ...g District Hangzhou P C 310053 Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com CHINT SOLAR ZHEJIANG Co Ltd Add 1335 Bin an Rd Binjiang District Hangzhou China 310053 Tel 86...

Отзывы: