Aston Technologies Inc.
13
◇
After the machine installation and before the connection with the power supply, please
do make sure the user's power supply and air supply meet the requirements of the
machine.
◇
The machine is connected to the circuit. The circuit must be standard equipped with a
fuse, ground wire and the automatic circuit breaker of 25A according the operation
rule(
Note:
Only the professional personnel can do the circuit work). The power plug of
the tire changer should be provided by the customer. (
Note:
The standard circuit of the
plug is 16A, but it must meet its Working Voltage).
◇
As shown in Figure 7, the air supply is connected to machine by a pipe connector
(Q) on the side of Oil Drier.
3.5.2
Debugging
Step 1: Pour some hydraulic oil into the Hydraulic Pump Box( The Hydraulic Oil should
be 80% of the box). Turn on the Switch U, connect the power supply and watch the
turning position of the Pump. It will be OK if it is clockwise. If it is anticlockwise,
change the wires in the power supply. If the Power supply is 220V, just operate
directly. After 10-15 minutes the machine can be operated.
Step 2: Step the Motor Pedal (V) to try clockwise or anticlockwise.
Q
Picture 7
Содержание ATC-T5
Страница 11: ...Aston Technologies Inc www astontechusa com 9 M K P G Y R S N U Picture 3 Z F I C V G ...
Страница 26: ...Aston Technologies Inc www astontechusa com 24 Assistant data 7 1 Electrical circuit diagram ...
Страница 27: ...Aston Technologies Inc www astontechusa com 25 8 0 Explosive View ...