Aston Technologies Inc.
8
2.3
Transportation
◇
The machine must be packed in the original factory and placed in the position specified
in the packing box. It must be carried out by a forklift truck or other tool with the
corresponding lifting capacity to move the packing machine.
2.4
Figure and part names
G
:
Clamp Wheel P
:
Column
U
:
Switch
I
:
Working Head
R
:
Hydraulic pump and Solenoid Valve
Z
:
Hook Control Valve K
:
Wheel Control
M
:
Hook Back & forward Valve S
:
Electric Cabinet P:Scram Button V:Pedal
Switch G:Oil Drier Y
:
Turntable
N
:
Hook
C
:
Inflation Gun
E
:
Automatic Hydraulic Wheel F
:
Hook up &down Valve
Picture 2
Содержание ATC-T5
Страница 11: ...Aston Technologies Inc www astontechusa com 9 M K P G Y R S N U Picture 3 Z F I C V G ...
Страница 26: ...Aston Technologies Inc www astontechusa com 24 Assistant data 7 1 Electrical circuit diagram ...
Страница 27: ...Aston Technologies Inc www astontechusa com 25 8 0 Explosive View ...