background image

14

d.

Discontinue charging when the specific gravity of the electrolyte reaches 1,260 or above.  A temperature compensating hydrometer
should be used for this reading.  Discontinue charging if the battery begins to gas  excessively or when the temperature of the
electrolyte reaches approximately 59

0

 C.  Do not overcharge the  battery.

OPERA
TING INSTRUCTIONS

*

CONTINUOUS RED LIGHT

 - Indicates AC power is on.

*

CONTINUOUS GREEN LIGHT

 - Indicates correct connection.  If when battery is connected, the green light does not light, check for

proper polarity or poor connections.  If the battery voltage is below 2 volts the green light will not come on.

*

CONTINUOUS YELLOW LIGHT

 - Indicates charging.

*

BLINKING GREEN LIGHT

 - Indicates charging is complete.

NOTES:
THREE SECOND DELAY

 - To avoid sparking, the charger control tests for correct polarity before applying current to the battery.  When

connected properly, the green light will come on for 3 seconds before the yellow light comes on.

BATTERY TEST

 - After the 3 second delay the charger control will begin a 6 second battery test.  The yellow light will be on and the meter

will indicate low current.

BATTERY CHARGE

 - After testing the battery, the control will select a charging rate suitable for the voltage and state of charge of the

battery.  A small battery, or a nearly charged battery will cause the charger to rapidly step down in current to avoid heating and gassing.

FINISH CHARGE

 - In order to reach a 100 % state of charge on the battery, a 3 hour finish cycle has been programmed into the charger

control.  During this cycle, if the battery voltage does not change over a fixed period of time the charger shuts off and the green light
comes on.

TIME OUT

 - An 11 hour timer will terminate the charging cycle if for some reason 100 % state of charge has not been reached.

COOLING FAN

 - When charging current exceeds 10 amps the cooling fan will come on to keep the electronics from overheating.  Below

10 amps the fan shuts off.  The fan will also come on briefly when the AC power first comes on.

BATTERY MAINTAINER

 - If the charger is left connected to the battery, it will begin recharging if the terminal voltage falls below 12.44

VDC.  It is recommended that the electrolyte level be checked regularly when charging batteries for an extended period of time.

OPERATING PROCEDURE:

1.

Plug AC cord into outlet.  Turn AC Power Switch on back of cabinet to the ON « I » position.  The Red light should come on and the
fan will run briefly.

2.

Put selector switch in the CHARGE position.

3.

Connect the BLACK clamp to the negative (-) terminal of the battery.  Connect the RED clamp to the positive (+) terminal of the
battery.  The GREEN light should come on for 3 seconds.

4.

The YELLOW light will come on when the GREEN light goes off.  After a 6 second battery test charging will begin.  The amount of
charging current can be observed on the meter.

Содержание 9520

Страница 1: ...aching a clamp to a battery post twist or rock the clamp back and forth several times to make a good connection 3 FOLLOW THESE STEPS WHEN CONNECTING THE BATTERY a Check the polarity of the battery posts The Positive POS P battery post usually has a larger diameter then the Negative NEG N battery post b Determine which post of the battery is grounded connected to the chassis If the negative post is...

Страница 2: ...cause the charger to rapidly step down in current to avoid heating and gassing FINISH CHARGE In order to reach a 100 state of charge on the battery a 3 hour finish cycle has been programmed into the charger control During this cycle if the battery voltage does not change over a fixed period of time the charger shuts off and the green light comes on TIME OUT An 11 hour timer will terminate the char...

Страница 3: ...EN light will blink d It is best to reset the charger control before beginning to charge another battery This can be accomplished by pulling the AC Power Switch OFF F then ON I again e Any time a malfunction is suspected reset the control by turning the AC Power Switch OFF F VEHICLE STARTING 1 Charge the battery for a minimum of 10 minutes using the procedure above 2 Put the selector switch in the...

Страница 4: ...ock when unit is subsequently used EXPLODED VIEW 9520 9520GS REPAIR PART LIST Item Description Part No 1 Handle 610619 2 Cabinet Top 9520 610755 Cabinet Top 9520GS 610756 3 Transformer 9520 610686 Transformer 9520GS 610678 4 Circuit Board 610679 5 Rate Switch 610620 Item Description Part No 6 Cabinet Base 610884 7 AC Cord 610614 8 DC Cable Set 610886 9 Stand Off set of 2 610759 10 Amp Meter 610685...

Страница 5: ... MAN GERMAN LANGUAGE SECTION PG 1 4 2 27 550D MAN DUTCH LANGUAGE SECTION PG 5 8 3 27 550F MAN FRENCH LANGUAGE SECTION PG 9 12 4 27 550E MAN ENGLISH LANGUAGE SECTION PG 13 16 DO NOT COMBINE INDIVIDUAL FILES INTO ONE DOCUMENT THE FILE SIZE BECOMES UNMANAGEABLE AND THE COMPUTER SLOWS TO A CRAWL Revision record 11 94 first printing 05 98 A4385 plt graphic change 6digit p n for base was 610754 is 61088...

Отзывы: