background image

Copyright ©2020, 2021,  ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or 
in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.

For technical support contact Yale

®

 at 800.438.1951 x5033 or [email protected]

2

8800 Series

Installation Instructions

Mortise Lock

80-8800-0016-000 11/21

1

Tools Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Indicator Variants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Lock Set Configuration  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Rehanding Indicator (if required) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Prepare Door for Mortise Lock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 

Install Lock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Prepare Door for Indicator  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Install Levers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Install Indicator Mounting Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Install Indicator Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Install Cylinder  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Install Outside Front . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Perform Functional Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Indicator Part List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

3

2

4

TOC

Table of Contents

5

6

1

2

3

6

7

8

9

1

Tools Required

#2 & #3 Phillips 

head screwdrivers

Flat blade 

screwdriver

1/8" Allen 

Wrench

3/32" Drill bit

T-20 Torx Screw 
with Tamper Pin 

Driver

4

5

Содержание Yale 8800 Series

Страница 1: ...rt contact Yale at 800 438 1951 x5033 or support yalelocks com This product can expose you to lead which is known to the state of California to cause cancer and birth defects or other reproductive harm For more information go to www P65warnings ca gov WARNING 8800 Series Mortise Lock Used with Sectional Trim and V Series Indicators 80 8800 0016 000 11 21 WARNING Attention Installer Improper instal...

Страница 2: ...0016 000 11 21 1 Tools Required 2 Indicator Variants 3 Lock Set Configuration 3 Rehanding Indicator if required 3 Installation 4 Prepare Door for Mortise Lock 4 Install Lock 4 Prepare Door for Indicator 4 Install Levers 5 Install Indicator Mounting Plate 5 Install Indicator Assembly 5 Install Cylinder 6 Install Outside Front 6 Perform Functional Check 6 Indicator Part List 7 3 2 4 TOC Table of Con...

Страница 3: ... include 8864 function Door Hand LH LHRB Note Stand on outside of locked door when determining door hand Next verify inside and or outside indicators are handed correctly using Spindle Cam Position chart Figure 3 If they are handed correctly skip to Step 5 Prepare Door If they are not handed correctly 1 Remove retaining pad and spindle cam from assembly Figure 4 2 Position spindle cam in correct d...

Страница 4: ...door Slide lock into door Figure 6 3 Temporarily hand tighten two 2 lock screws 12 x 1 1 4 wood screws or 12 24 x1 2 machine screws NOTE Keep door open until installation is complete 3 Prepare Door for Indicator Control Hub Guide Template Figure 7 Mark holes with pencil 1 Insert template guide into control hub on side where indicator will be used Figure 7 2 Slide indicator template over template g...

Страница 5: ...erify lock is in unlocked state turn outside lever to confirm 2 Verify indicator is in vacant unlocked position 3 Assemble indicator assembly onto mounting plate Figure 10 4 Secure indicator assembly to door with two 2 machine screws Use 8 32 x 5 8 screw for top Use 8 32 x 3 8 screw for bottom 5 If indicators are being used on both sides of door repeat steps 6 1 through 6 3 for opposite side NOTE ...

Страница 6: ... 7 2 for second cylinder Interchangeable Core cylinders require a control key to remove and install the core This is not pro vided standard It must be requested seperately Cylinder Cylinder Clamp Screw Key and cylinder must be rotated as shown 8 Install Outside Front 1 Tighten the two 2 lock screws completely Figure 13 2 Attach outside front with two 2 flat head screws 8 32 x 1 4 9 Perform Functio...

Страница 7: ... 4000 Indicator Display Assembly Green Unlocked Icon Red Locked Icon 82 5604 4000 Indicator Display Assembly White Unlocked Red Locked 82 5605 4000 Indicator Display Assembly White Vacant Red Occupied 82 5606 4000 Indicator Display Assembly White Unlocked Icon Red Locked Icon 82 5607 4000 Indicator Display Assembly Green Ouvert Red Fermé 82 5684 4000 Indicator Display Assembly Green Libre Red Occu...

Страница 8: ...sion of ASSA ABLOY Access and Egress Hardware Group Inc is prohibited Patent pending and or patent www assaabloydss com patents U S A Yale Locks Hardware Address 225 Episcopal Road Berlin CT 06037 4004 Tel 1 800 438 1951 Fax 1 800 338 0965 yalecommercial com Canada ASSA ABLOY Door Security Solutions Canada Address 160 Four Valley Drive Vaughan Ontario L4K 4T9 Tel 1 800 461 3007 Fax 1 800 461 8989 ...

Отзывы: