Cable Specifications
D-1
Re
lian
ce
F
und
ame
n
tals
C
a
b
le S
p
eci
ficat
io
n
s
The interface cable (Figure D.1) attaches to the SCA-12 receiver.
The DB-25 connector on the left side of Figure D.1 plugs into the SCA-12 receiver. The
four connectors on the right side are, from top to bottom, as follows: the power connector,
which connects to a cable with two Panasonic camcorder batteries; a male DB-9 (Port A -
PPS out) connector, which connects to the FS/2, a male DB-9 (Port B - Event In)
connector, which connects to an RTCM radio (optional); and a male DB-9 (Port C - Boot)
connector, which connects to a PC.
Figure D.1: Interface cable
D
Cable Specifications
Содержание Reliance FS/2
Страница 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Страница 6: ...vi Reliance with FS 2 Field Operations Manual...
Страница 14: ...xiv Reliance with FS 2 Field Operations Manual...
Страница 26: ...10 Reliance with FS 2 Field Operations Manual...
Страница 150: ...134 Reliance with FS 2 Field Operations Manual...
Страница 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Страница 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Страница 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Страница 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Страница 182: ...F 6 Reliance with FS 2 Field Operations Manual...