B-2
Reliance with FS/2 Field Operations Manual
7.
Press F4 (RETN) to return to the Receiver Setup screen (Figure B.2).
8.
Enter the PDOP mask, measured antenna height, and satellite elevation
mask.
9.
Press F4 (OK) to accept the changes and return to the GIS main menu.
10. Press F3 (LGST) to open the Datalogging Setup screen (Figure B.3).
Figure B.2: Receiver Setup Screen
Figure B.3: Datalogging Setup Screen
Содержание Reliance FS/2
Страница 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Страница 6: ...vi Reliance with FS 2 Field Operations Manual...
Страница 14: ...xiv Reliance with FS 2 Field Operations Manual...
Страница 26: ...10 Reliance with FS 2 Field Operations Manual...
Страница 150: ...134 Reliance with FS 2 Field Operations Manual...
Страница 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Страница 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Страница 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Страница 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Страница 182: ...F 6 Reliance with FS 2 Field Operations Manual...