14
ACCESSORY INSTALLATION
THERMODISC
THERMODISC
COVER
4” ELECTRICAL
JUNCTION BOX
BLOWERS
BLOWERS GASKET
CLIP NUTS
(Not used in the upper center hole.)
ASSEMBLY OF FURNACE
Your furnace requires the following items to be assembled or installed by the service person:
Blowers and Blower Controls
Electrical Connections
1)
Remove all parts from inside the furnace and inspect for damage, including the
fi
rebrick as some breakage
could occur during shipment.
2)
Install the thermodisc on rear of furnace cabinet with the two screws provided. Mount the conduit assembly
from the junction box to the thermostat bracket. Crimp the two female terminals to each of the wire leads.
Plug the wires to the thermodisc. NOTE: It does not matter which of the two wires plugs to which terminal on
the thermodisc.
3)
Remove blowers from cartons. Remove junction box cover. Attach clip nuts as in
fi
gure shown. Install blower(s)
and gasket(s with 1/4"-20 x 3/4" bolts as shown.
4)
Wire right side blower
fi
rst (See wiring diagram) and replace cover on junction box on blower.
5)
Wire left blower same as above and replace cover.
6)
Check operation of shaker grates with grate handle before operating furnace.
Содержание AF700
Страница 10: ...10 CENTRAL INSTALLATION ADD ON INSTALLATION ...
Страница 12: ...12 INSTALLATION D INSTALLATION E ...
Страница 13: ...13 INSTALLATION H TOP VIEW FRONT VIEW INSTALLATION F INSTALLATION G ...
Страница 32: ...32 NOTES ...
Страница 33: ...33 NOTES ...