1. Preparing the Basin for Installation

•  Remove the basin cover by removing the basin cover 

  fasteners. Remove the package containing the inlet hub  

  (D), check valve (C) and cord grommet (B). 

•  Remove the pump power cord and float switch cord (if  

  necessary) from the inside of the basin, removing all slack  

  from the cord(s). Ensure the cord(s) are not tangled around  

  the pump or float switch. Verify the float switch is able to  

  move freely.

•  Feed the cord(s) through the cord grommet hole (4) on  

  the basin cover, place the cover on the basin ensuring the  

  discharge flange and the discharge piping are in the 

  correct orientation. 

•  Press each cord through the slit and into the hole on the  

  cord grommet (B), 2 hole cord grommet for pumps with a  

  float cord and a 1 hole grommet for 1 cord systems. Press  

  the grommet (B) into the grommet hole (4) to provide a 

  tight seal. 

•  Secure the basin cover onto the basin with the basin cover  

  fasteners removed in the first step. 

 

2. Preparing the installation location

•  Excavate a hole large enough to accommodate the    

  basin (A), backfill material (1) and inlet piping (2).

•  Add 4 – 6 in. of clean sub-base material or concrete    

  (3) to the bottom of the hole.

•  Assure that it is level, compacted, and smooth.

•  Place the basin (A) in the hole and ensure that it 

  is level.

3. Connecting the inlet piping

•  Connect the inlet piping (1) as required by code 

  using the 4 in. snap-in inlet hub (D). Hand-Tighten    

  the hose clamp.

•  Carefully backfill with naturally rounded gravel or  

 

  stone, larger than 3/8 in. and smaller than 3/4 in. 

  diameter,around the periphery of the basin (A).

Installation

Please contact 1-855-281-6830 for further assistance    ashlandpump.com

4

Содержание SW40WB2424

Страница 1: ...g this pump system Take the time to read the instructions carefully before using this product We strongly recommend that you keep this instruction manual in a safe place for future reference SW40WB183...

Страница 2: ...rs to secure the cover to the basin Automatic all cast iron sewage pump passes 2 in solids and features 20 ft power and piggyback float switch cords System pumps up to 125 GPM Ultra quiet heavy duty A...

Страница 3: ...with automatic reset thermal overload protection Ball bearings for quiet operation Handles 2 solids Easily replaceable 20 foot power cord Mechanical shaft seal for long life Support 400 lbs Sewage Pu...

Страница 4: ...ith a float cord and a 1 hole grommet for 1 cord systems Press the grommet B into the grommet hole 4 to provide a tight seal Secure the basin cover onto the basin with the basin cover fasteners remove...

Страница 5: ...lve C and connect this pipe to the appropriate sewer main pipe for discharge Hand tighten the fittings to ensure a watertight seal 5 Attaching the vent connection Install a 2 in PVC Schedule 40 thread...

Страница 6: ...to shut off service to the house or call your local fire department for instructions Remove pump and repair or replace Failure to follow this warning can result in fatal electrical shock WARNING Exte...

Страница 7: ...to be submerged WARNING Do not use extension cords They are a fire hazard and can reduce voltage sufficiently to prevent pumping and or damage the motor WARNING Do not handle or service the pump while...

Страница 8: ...ng your Ashland Pump product Without limiting the foregoing Ashland Pump specifically disclaims the implied warranties of merchantability and fitness for a particular purpose No warranties or represen...

Отзывы: