background image

11

x

2

b

a

35cm (13¾")

a

b

Place the maiden bar 
onto the dowels in the 
main upright and secure 
with a 50mm (2”) bolt 

and barrel 
nut.

Insert the end of the flyer 
shaft into the rear flyer 
bearing and click the 
flyer orifice into the front 
flyer bearing.
Tie the nylon brake band 
to spring  . Thread 
the nylon brake band 
through the eye and tie 
spring   35cm (13 ¾”) 
from spring  , then cut 
the surplus nylon off and 
tie it to the other end of 
spring  .
Take the nylon brake 
band up and over the 
groove in the bobbin and 
place spring   onto the 

hook. Insert the tension 
knob into the maiden 
bar, thread the end of 
the nylon brake band 
through the hole in the 
tension knob and tie a 
knot. Turn the tension 
knob to wind on excess 
nylon.  

Take care not to 
over-stretch the 
springs.

Содержание KIWI 3 SPINNING WHEEL

Страница 1: ...r you purchased it from To validate the guarantee please go to www ashford co nz product registration or email us Ashford Handicrafts Limited Factory and Showroom 415 West Street PO Box 474 Ashburton...

Страница 2: ...s Required Hints More Information The Wheel Magazine Ashford s annual fibrecraft magazine Spinning weaving felting dyeing and knitting projects patterns and articles from around the world To receive t...

Страница 3: ...3 Real Scale Hardware List x8 x8 x10 x2 x1 x3 x1 x2 x2 x1 x16 x2 x1 x1 x2 x2 x1 x1 x2 x4 Metal Plate x1 Drive Band x2...

Страница 4: ...f oil to the flyer shaft and slide a bobbin and flyer whorl into position Loosely attach the front feet to the treadle rail with 50mm 2 bolts and barrel nuts Sit the base on a flat surface and check t...

Страница 5: ...s into the polyurethane hinges Then attach the hinges to the treadle rail with 16mm screws Lay the base on its back Remove the protective film and locate the metal cover plates into the polyurethane h...

Страница 6: ...x2 x4 x2 Tap wooden dowels down to the bottom of the holes in the back feet Attach the toe saver to the base with 50mm 2 screws x2 Attach the back feet to the front feet with 30mm 1 bolts washers and...

Страница 7: ...rel nuts Note the toe saver is towards the front Position the main upright onto the holes in the base Check that the ball bearing with the extension faces the back Secure main upright in place with a...

Страница 8: ...8 x1 The groove for the hub pin is to the back Slide the brass spacer onto the crank Then slide the wheel on Slide the crank through the ball bearings If necessary apply a drop of oil to the crank...

Страница 9: ...groove in the wheel with the hole in crank Locate the hub pin into the groove and tap partially into the hole in the crank Place the indented end of a lazy kate pin over the hub pin and carefully tap...

Страница 10: ...2 bolt and barrel nuts Check the supports are level with the edges of the maiden bar then tighten Screw the hook and eye into the maiden bar Slide the inner shell of the conrod universal joint onto th...

Страница 11: ...spring Thread the nylon brake band through the eye and tie spring 35cm 13 from spring then cut the surplus nylon off and tie it to the other end of spring Take the nylon brake band up and over the gro...

Страница 12: ...of 5 5 1 For higher flyer speeds locate the drive band on the middle or small flyer whorl and corresponding grooves in the wheel These give flyer to wheel ratios of 7 5 and 9 5 1 Gently tap the inden...

Страница 13: ...spinning easier apply a drop of Ashford Spinning Wheel Oil to the flyer bobbin and conrod bearings Note The ball bearings are sealed for life and do not require oiling When not using your spinning wh...

Страница 14: ...sition the crank between the treadle boards 5 Then tighten the knobs to lock in the upright position Carry your Kiwi 3 either by the main upright wheel or maiden bar Before you begin spinning you need...

Отзывы: