background image

 

Page 10 of 21 

 

Depressurize the pressure metering pipe. 

 

Open the bayonet ring and remove ring and window.  

 

Hold the pointer in place while turning the screw, until the 
pointer (after releasing again) has the correct position. 

 

Close the case again and pay attention to correct fit of 
window, gasket and bayonet ring. 

 

Liquid filled gauges must be demounted before the zero 
point adjustment can be done (on a horizontal area  to 
prevent leaking). 

 

 

 

 

 

 

 

8.4.2  Setting the switch point 

An  adjustable lock is fitted in the front panel of the pressure 
gauge. Using the removable adjustment key, the contacts 
mounted on the target value indicators can be set to any point on 
the range covered by the scale. 

For reasons relating to accuracy of switching and the lifetime of 
mechanical measurement systems, the switch points should be 
positioned between 10% and 90% of the range. 

 

Place the adjustment key on the axle of the adjustable lock. 

 

Press the axle inwards, until the carrier arm grips behind the 
adjuster pin on the target value indicator. 

 

By turning the key, adjust the target value indicator to the 
desired switch point. 

Release the pressure on the axle, and remove the adjustment key. 

 

8.4.3  Contact function 

Function 1: Close contacts with the indication rising in a clockwise direction. 

Function 2: Open contacts with the indication rising in a clockwise direction. 

Contact assignment: 

1st contact left target value indicator, 

2nd contact middle target value indicator, 

3rd contact right target value indicator 

 

8.5  Subsequent relocation of the gauge (by the customer) 

Recommendation:

 Do not remove the pressure gauge from one metering point and fit it in a different place, 

as there is a risk of the measuring media being mixed, with unforeseeable chemical reactions. 

9  Servicing 

The device is maintenance-free. However, to ensure reliable operation and a long lifetime for the device, we 
recommend that it is checked regularly. 

9.1  Safety 

Содержание T5500

Страница 1: ...on Manual Bourdon tube pressure gauge model T5500 and T6500 for explosion risk areas pursuant to Directive 94 9 EC ATEX In the following configuration T5500 T6500 ATEX bourdon tube pressure gauge without switching contact T5500 T6500 I ATEX bourdon tube pressure gauge with inductive proximity switch ...

Страница 2: ...hing contact 5 3 2 T5500 T6500 I with inductive proximity switch KE I 0C0H2 5 4 Technical data 6 5 Labeling on the device 6 5 1 Labeling on the device for explosion risk areas ATEX 6 6 Construction and function 7 6 1 Overview 7 6 2 Description of function 7 6 3 Description of components 7 6 4 Accessories 8 7 Transport 8 7 1 Safety 8 7 2 Transport inspection 8 7 3 Storage 8 8 Assembly Installation ...

Страница 3: ... important safety information which if not followed may result in risks for people and animals or to property and buildings 1 2 Symbols Warning This indicates a possibly hazardous situation where failing to follow advice may result in risks to people animals the environment and buildings Information This emphasizes key information for efficient fault free operation 1 3 Limits of liability Failure ...

Страница 4: ... 10 Faults Conversion works or other technical alterations to the device by the customer will violate the approval for hazardous area and are not permitted This also applies to installation of spare parts Possible conversations or alterations may only be carried out by the manufacturer The operational safety of the device is only guaranteed where it is used for its intended purpose The specificati...

Страница 5: ...ated or the permitted temperature of the measuring medium reduced Note To avoid additional temperature increase the devices should not be exposed to direct exposure to sunlight when in operation The effects of impact are considered as negligible For the non electrical part of the devices the standards EN 1127 1 2007 EN 13463 1 2009 and EN 13463 5 2011 are applicable with regard to explosion protec...

Страница 6: ...gard to explosion protection The relevant requirements of these standards are satisfied The documentation for the mechanical part has been filed with TÜV Nord Cert see declaration of conformity Labeling II 2 G c IIC T6 and PTB 99 ATEX 2219 X II 2 G Ex ia IIC T6 for the inductive proximity switch Recommended isolating switch devices MTL 5011B 1 channel for contacts inductive proximity switch operat...

Страница 7: ...essure Under pressure the elastic tube is deflecting against the zero position This deflection is proportional to the adjacent pressure The movement transfers the deflection to the pointer The display of the measured value is given on a 270 scale 6 3 Description of components 6 3 1 Scale with pointer The pressure gauge is equipped with a dial face and pointer pursuant to EN 837 1 nominal size 100 ...

Страница 8: ... to 70 C protected against direct exposure to sunlight and protected against impact damage 8 Assembly Installation 8 1 Safety To ensure safe working during installation and servicing suitable shut off valves must be installed in the plant see 6 4 Accessories enabling the device To be depressurized or taken out of operation To be disconnected from the mains supply for repair or checks within the re...

Страница 9: ...locally applicable regulations and guidelines for installing and operating electrical plant in explosion risk areas e g EN 60079 14 etc Connection to be undertaken by authorized and qualified specialist staff only The electrical connection of the device is to be undertaken in accordance with the relevant regulations of the VDE and the regulations supplied by the local utilities company Disconnect ...

Страница 10: ...lace the adjustment key on the axle of the adjustable lock Press the axle inwards until the carrier arm grips behind the adjuster pin on the target value indicator By turning the key adjust the target value indicator to the desired switch point Release the pressure on the axle and remove the adjustment key 8 4 3 Contact function Function 1 Close contacts with the indication rising in a clockwise d...

Страница 11: ...ed in line with the operating conditions and ambient conditions In the event of various device components interacting the operating instructions for all other devices should also be taken into account Check on display Check on function in conjunction with downstream components Check of pressurized connection pipes for seal condition Check of electrical connections 9 3 Cleaning and maintenance Clea...

Страница 12: ... risk to people the environment and equipment Adequate precautionary measures must be adopted If necessary the devices must be cleaned thoroughly see advice in safety data sheets 11 2 Removal When undertaking servicing work on the device the pressure lines must be depressurized the electrical connections isolated from the mains supply and the plant secured against being switched on again Demount t...

Страница 13: ...Page 13 of 21 12 2 Declaration of Conformity for device without switching contact ...

Страница 14: ...Page 14 of 21 12 3 Declaration of Conformity for device with inductive proximity switch ...

Страница 15: ...Page 15 of 21 12 4 EU design type test certification dusts for inductive proximity switches of types SJ KE I 0C0H2 ...

Страница 16: ...Page 16 of 21 ...

Страница 17: ...Page 17 of 21 ...

Страница 18: ...Page 18 of 21 ...

Страница 19: ...Page 19 of 21 ...

Страница 20: ...Page 20 of 21 ...

Страница 21: ...Page 21 of 21 ...

Отзывы: