7.4.1  Zero point adjustment 

The devices are supplied calibrated ex works, so that as a rule there is no 
need for calibration operations at the installation point. However, it is 
possible to adjust the zero point on site, and this is performed as follows: 

 

Switch the pressure metering pipe so that it is depressurized, or 
charge it with the existing static pressure. 

 

Open the front face of the device, by loosening the bayonet ring. This 
may require a belt wrench.  

 

Hold the pointer in place and adjust the pointer bushing using a 
screwdriver, until the pointer (when released) is pointing correctly to 
zero. 

 

Close the case again and ensure that the seal, glass plate and locking ring are seated correctly. 

 

Liquid-filled devices must be dismantled for the zero point adjustment, and placed on a horizontal surface 
for adjustment, since otherwise the liquid would run out. 

 

7.5 Subsequent 

relocation 

of 

the gauge (by the customer) 

Recommendation:

 Do not remove the pressure gauge from one metering point and fit it in a different 

place, as there is a risk of the measuring media being mixed, with unforeseeable chemical reactions. 

 

8 Servicing 

The device is maintenance-free. However, to ensure reliable operation and a long lifetime for the device, we 
recommend that it is checked regularly. 

8.1 Safety 

When undertaking servicing work on the device, the pressure lines must be depressurized and the plant secured 
against being switched on again. 

8.2  Check on function, and recalibration 

The check on function and recalibration is carried out at regular intervals, depending on the application. The precise 
testing cycles should be adjusted in line with the operating conditions and ambient conditions. In the event of various 
device components interacting, the operating instructions for all other devices should also be taken into account. 

 

Check on display. 

 

Check on function, in conjunction with downstream components. 

 

Check of pressurized connection pipes for seal condition. 

 

Check of electrical connections. 

8.3 Cleaning 

and 

maintenance 

Cleaning is carried out using a non-aggressive cleaning agent, respecting the protection category of the device. 

9 Faults 

9.1 Safety 

Defective or faulty pressure gauges put the operational safety and process safety of the plant at risk, and can lead to a 
risk of injury to persons, the environment or the plant. 

9.2  Conduct in the event of faults 

All defective or faulty devices must be taken out of service. If a repair is required, the device must be sent directly to 
our Repairs Department. We request that all returns of devices are agreed with our Service Department. 

 

Содержание F5510

Страница 1: ...IM F5510 E Rev 0 05 2011 Page 1 of 8 Operating Manual Differential pressure gauge model F5510 non electrical device in a 100 F5510 configuration for industrial application...

Страница 2: ...ling on the device 4 5 Construction and function 5 5 1 Overview 5 5 2 Description of function 5 5 3 Description of components 5 5 4 Accessories 5 6 Transport 5 6 1 Safety 5 6 2 Transport inspection 5...

Страница 3: ...mits of liability Failure to respect this safety information the intended uses or the limit values relating to use indicated in the technical data for the device may result in risk or to injury to peo...

Страница 4: ...for accident prevention and the operator s internal regulations regarding working operations and safety must be respected The operator is responsible for all specified servicing inspection and install...

Страница 5: ...iption of components 5 3 1 Scale with pointer The pressure gauge is equipped with a dial and pointer similar to EN 837 nominal size 100 mm Erl uterung zus tzlich ein Hinweis 5 3 2 Instrument connectio...

Страница 6: ...orrected see 7 4 1 Zero point adjustment 7 3 1 Process connection Connection must be undertaken by authorized and qualified specialist staff only Use only with the mechanical process connection provid...

Страница 7: ...peration and a long lifetime for the device we recommend that it is checked regularly 8 1 Safety When undertaking servicing work on the device the pressure lines must be depressurized and the plant se...

Страница 8: ...titute a risk to people the environment and equipment Adequate precautionary measures must be adopted If necessary the devices must be cleaned thoroughly see advice in safety data sheets 10 2 Removal...